Maryse M. H. Chappin, J. Faber, Marius T. H. Meeus
{"title":"Learning Patterns in Early Stage R&D Projects: Empirical Evidence from the Fibre Raw Material Technology Project in the Netherlands","authors":"Maryse M. H. Chappin, J. Faber, Marius T. H. Meeus","doi":"10.1111/radm.12358","DOIUrl":null,"url":null,"abstract":"Past research has reported that learning processes in early stage RD (2) a vacuous pattern of negative outcomes resulting in modifications of action courses; and (3) a verification pattern of positive outcomes resulting in modifications of action courses. We observed the virtuous and verification patterns during the first 2 years and virtuous and vacuous learning in the second 2 years. These results might be useful for R&D managers since they provide insight into how an early stage R&D project can develop and where managers might intervene and adjust action courses.","PeriodicalId":150866,"journal":{"name":"IRPN: Innovation Strategy (Topic)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IRPN: Innovation Strategy (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1111/radm.12358","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
Past research has reported that learning processes in early stage RD (2) a vacuous pattern of negative outcomes resulting in modifications of action courses; and (3) a verification pattern of positive outcomes resulting in modifications of action courses. We observed the virtuous and verification patterns during the first 2 years and virtuous and vacuous learning in the second 2 years. These results might be useful for R&D managers since they provide insight into how an early stage R&D project can develop and where managers might intervene and adjust action courses.