Reducing risk for central site equipment moves

ACM '83 Pub Date : 1900-01-01 DOI:10.1145/800173.809720
Roger W. Kleffman, Rick Glesener, Jerry Brzeczek
{"title":"Reducing risk for central site equipment moves","authors":"Roger W. Kleffman, Rick Glesener, Jerry Brzeczek","doi":"10.1145/800173.809720","DOIUrl":null,"url":null,"abstract":"Equipment changes - moving, adding or removing units in a central computer facility - can have a devastating effect on a computer center. Equipment failures and cable problems can result in prolonged service outages, user disservice and management frustration. Risks from these changes can be effectively controlled by means of sound implementation planning tools. An effective methodology based on a graphics technique that accurately represents equipment location in a computer room on standard size paper provides the planning tools that minimizes the risk of outages.","PeriodicalId":306306,"journal":{"name":"ACM '83","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACM '83","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/800173.809720","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Equipment changes - moving, adding or removing units in a central computer facility - can have a devastating effect on a computer center. Equipment failures and cable problems can result in prolonged service outages, user disservice and management frustration. Risks from these changes can be effectively controlled by means of sound implementation planning tools. An effective methodology based on a graphics technique that accurately represents equipment location in a computer room on standard size paper provides the planning tools that minimizes the risk of outages.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
降低中心站点设备移动的风险
设备变更——在中央计算机设施中移动、增加或移除设备——会对计算机中心造成毁灭性的影响。设备故障和电缆问题可能导致长时间的服务中断,用户服务不便和管理挫折。通过合理的实施计划工具,可以有效地控制这些变化带来的风险。一种基于图形技术的有效方法,可以在标准尺寸的纸张上准确地表示机房中的设备位置,从而提供了将停机风险降至最低的规划工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optical storage of page images and pictorial data - opportunities and needed advances in information retrieval Office automation and the changing definition of the workplace Why Ada is not just another programming language Session M4: Women in the workplace Network protocol: A structured approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1