Analisa Penjadwalan Produksi Emergency Air Reciever dengan Menggunakan Master Production Schedule di PT. Boma Bisma Indra

Muchammad Assaabiq, R. Yuniawati
{"title":"Analisa Penjadwalan Produksi Emergency Air Reciever dengan Menggunakan Master Production Schedule di PT. Boma Bisma Indra","authors":"Muchammad Assaabiq, R. Yuniawati","doi":"10.31599/jaringsaintek.v4i1.1019","DOIUrl":null,"url":null,"abstract":"PT Boma Bisma Indra (Persero) is a State-Owned Enterprise (BUMN) which has 3 divisional business units, one of which is the industrial machinery and equipment division (MPI) and the foundry unit located on Jl. Imam Bonjol No. 18 Bugul Lor, Pasuruan City, East Java. The industrial machinery and equipment division and foundry unit (MPI) located in Pasuruan has grown rapidly as a company that focuses on manufacturing machinery and produces products such as Oil & Gas/ Refinery / Petrochemical Industries, Power plans, Iron Casting, and Pressure Vessels. In PT. Boma Bisma Indra, whose orientation is a make-to-order company, where the new company will procure raw materials and run production if there is a request from the customer. Difficulties that are often encountered in make-to-order companies are delays in the arrival of raw materials, and process delays caused by inadequate workers. Therefore, a method called the Master Production Schedule (MPS) is needed where this method will determine the time period that will be required for each process starting from the preparation of documents related to procedures and product specifications to the finishing fabrication process. This research focuses on timeliness analysis in every process in the master production schedule using the master production schedule (MPS) method.","PeriodicalId":286819,"journal":{"name":"Jurnal Jaring SainTek","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Jaring SainTek","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31599/jaringsaintek.v4i1.1019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT Boma Bisma Indra (Persero) is a State-Owned Enterprise (BUMN) which has 3 divisional business units, one of which is the industrial machinery and equipment division (MPI) and the foundry unit located on Jl. Imam Bonjol No. 18 Bugul Lor, Pasuruan City, East Java. The industrial machinery and equipment division and foundry unit (MPI) located in Pasuruan has grown rapidly as a company that focuses on manufacturing machinery and produces products such as Oil & Gas/ Refinery / Petrochemical Industries, Power plans, Iron Casting, and Pressure Vessels. In PT. Boma Bisma Indra, whose orientation is a make-to-order company, where the new company will procure raw materials and run production if there is a request from the customer. Difficulties that are often encountered in make-to-order companies are delays in the arrival of raw materials, and process delays caused by inadequate workers. Therefore, a method called the Master Production Schedule (MPS) is needed where this method will determine the time period that will be required for each process starting from the preparation of documents related to procedures and product specifications to the finishing fabrication process. This research focuses on timeliness analysis in every process in the master production schedule using the master production schedule (MPS) method.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PT Boma Bisma Indra (Persero)是一家国有企业(BUMN),拥有3个业务部门,其中一个是工业机械和设备部门(MPI)和位于j1的铸造部门。Imam Bonjol, 18号Bugul Lor, Pasuruan市,东爪哇。工业机械设备事业部和铸造事业部(MPI)位于帕素然,作为一家专注于机械制造和生产石油和天然气/炼油/石化工业,电力计划,铸铁件和压力容器等产品的公司,发展迅速。在PT. Boma Bisma Indra,它的定位是一个按订单生产的公司,如果有客户的要求,新公司将采购原材料并运行生产。在定制公司中经常遇到的困难是原材料的延迟到达,以及由于工人不足造成的过程延迟。因此,需要一种称为主生产计划(MPS)的方法,该方法将确定从准备与程序和产品规格相关的文件到最终制造过程的每个过程所需的时间周期。本文采用主生产计划(MPS)方法对主生产计划中各工序的时效性进行分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Evaluasi Aplikasi My Telkomsel Menggunakan Metode Usability Testing Identifikasi Postur Kerja dengan Metode Owas untuk Memperbaiki Postur Kerja Guna Mengurangi Musculoskeletal Disorder Penerapan Algoritma Apriori Untuk Rekomendasi Produk Bagi Pelanggan Toko Online Berbasis Website Aplikasi Transformasi Reduction to Pole (RTP) Menggunakan Matlab dalam Pengolahan Data Magnetik WDMAM pada Wilayah Tapal Kuda -Jawa Timur Identifikasi Nilai Keekonomian Survey Hidrografi-Geofisika menggunakan Peralatan Multibeam Echosounder (MBES)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1