Wanapum Dam repaired using post-tensioning anchors

Abigail Stein, Aled Hughes, R. Deschamps, B. D. Barkauskas
{"title":"Wanapum Dam repaired using post-tensioning anchors","authors":"Abigail Stein, Aled Hughes, R. Deschamps, B. D. Barkauskas","doi":"10.1080/19375247.2018.1562599","DOIUrl":null,"url":null,"abstract":"In central Washington, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and operated by Grant County Public Utility District (GCPUD). The dam extends approximately 8300 feet from bank to bank and includes earth embankments, concrete gravity sections and a 10 unit powerhouse. Adjacent to the right embankment is a concrete gravity spillway featuring radial gates measuring 50-feet wide and nearly 70-feet high. In the early 1960s, when built, these seven-story spillway gates were the highest in the world. In February 2014, during a routine maintenance inspection, observant workers noticed a slight misalignment in the roadway deck curbs and handrails on top of the spillway. Further investigation uncovered a 65-foot long by 2-inch wide crack that spanned the full length of Monolith 4. Due to the potential risks of a catastrophic failure, GCPUD immediately drew down the reservoir and began work on developing an emergency remedial procedure to repair the crack in the dam. Sixty-one-strand post-tensioned anchors, underwater Ogee Spillway bar anchors and a grouting program to seal the crack were among the main techniques performed to repair the Dam. This case study will address in detail the successful use of these techniques.","PeriodicalId":272645,"journal":{"name":"DFI Journal - The Journal of the Deep Foundations Institute","volume":"119 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"DFI Journal - The Journal of the Deep Foundations Institute","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/19375247.2018.1562599","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In central Washington, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and operated by Grant County Public Utility District (GCPUD). The dam extends approximately 8300 feet from bank to bank and includes earth embankments, concrete gravity sections and a 10 unit powerhouse. Adjacent to the right embankment is a concrete gravity spillway featuring radial gates measuring 50-feet wide and nearly 70-feet high. In the early 1960s, when built, these seven-story spillway gates were the highest in the world. In February 2014, during a routine maintenance inspection, observant workers noticed a slight misalignment in the roadway deck curbs and handrails on top of the spillway. Further investigation uncovered a 65-foot long by 2-inch wide crack that spanned the full length of Monolith 4. Due to the potential risks of a catastrophic failure, GCPUD immediately drew down the reservoir and began work on developing an emergency remedial procedure to repair the crack in the dam. Sixty-one-strand post-tensioned anchors, underwater Ogee Spillway bar anchors and a grouting program to seal the crack were among the main techniques performed to repair the Dam. This case study will address in detail the successful use of these techniques.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用后张锚固修复Wanapum大坝
在华盛顿中部,哥伦比亚河的水流由瓦纳普姆大坝控制,瓦纳普姆大坝是格兰特县公用事业区(GCPUD)拥有和运营的祭司急流水电项目的一部分。大坝从两岸延伸约8300英尺,包括土堤防,混凝土重力部分和10个单元的发电站。与右侧堤防相邻的是一条混凝土重力溢洪道,其径向闸门宽50英尺,高近70英尺。在20世纪60年代初建成时,这些七层的泄洪闸是世界上最高的。2014年2月,在一次例行维护检查中,细心的工人注意到溢洪道顶部的桥面路缘和扶手有轻微的错位。进一步的调查发现了一条65英尺长,2英寸宽的裂缝,它横跨了巨石4号的整个长度。由于潜在的灾难性失败的风险,GCPUD立即降低了水库,并开始制定紧急补救程序来修复大坝的裂缝。61股后张锚杆、水下Ogee溢洪道锚杆和封堵裂缝的灌浆程序是修复大坝的主要技术。本案例研究将详细介绍这些技术的成功使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Note – Issue 3 (2018) Measured end resistance of CFA and drilled displacement piles in San Francisco Area alluvial clay DFI Journal Underwriters A sensitivity analysis on the parameters affecting large diameter helical pile installation torque, depth and installation power for offshore applications The deep soil mixing for the Galataport project in Istanbul, Turkey
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1