{"title":"Multiple resource expansion planning in smart grids with high penetration of renewable generation","authors":"Yang Cao, Miao He, Zhiqiang Wang, Tao Jiang, Junshan Zhang","doi":"10.1109/SmartGridComm.2012.6486045","DOIUrl":null,"url":null,"abstract":"We study joint expansion planning of conventional generation capacity, wind generation capacity and tie line capacity in a multi-area smart grid system. Specifically, we formulate the expansion planning problem as a two-stage stochastic programming problem: 1) in the first stage, resource expansion plans are made to minimize the expected overall cost throughout the entire planning horizon; 2) in the second stage, given the realization of load and wind generation in hourly scheduling slots, optimal scheduling decisions of power flows are found by minimizing the cost incurred by conventional generation and/or loss of load, which is used to compute the expected operation cost and/or loss of load cost as part of the cost in the first stage. In particular, the optimal solution to the resource expansion planning problem is obtained using the L-shaped algorithm. The simulation results of several case studies indicate that the optimal expansion plans for a multi-area smart grid indeed depend on the uncertainty level of prospective wind generation, the existing generation capacity and the transmission capacity.","PeriodicalId":143915,"journal":{"name":"2012 IEEE Third International Conference on Smart Grid Communications (SmartGridComm)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2012-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE Third International Conference on Smart Grid Communications (SmartGridComm)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SmartGridComm.2012.6486045","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

We study joint expansion planning of conventional generation capacity, wind generation capacity and tie line capacity in a multi-area smart grid system. Specifically, we formulate the expansion planning problem as a two-stage stochastic programming problem: 1) in the first stage, resource expansion plans are made to minimize the expected overall cost throughout the entire planning horizon; 2) in the second stage, given the realization of load and wind generation in hourly scheduling slots, optimal scheduling decisions of power flows are found by minimizing the cost incurred by conventional generation and/or loss of load, which is used to compute the expected operation cost and/or loss of load cost as part of the cost in the first stage. In particular, the optimal solution to the resource expansion planning problem is obtained using the L-shaped algorithm. The simulation results of several case studies indicate that the optimal expansion plans for a multi-area smart grid indeed depend on the uncertainty level of prospective wind generation, the existing generation capacity and the transmission capacity.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
可再生能源发电高渗透率的智能电网多资源扩展规划
研究了多区域智能电网系统中常规发电容量、风力发电容量和并网容量的联合扩容规划。具体地说,我们将扩展规划问题表述为一个两阶段的随机规划问题:1)在第一阶段,制定资源扩展计划,使整个规划范围内的期望总成本最小;2)在第二阶段,考虑在小时调度时段实现负荷和风力发电,通过使常规发电成本和(或)负荷损失成本最小化,求出潮流的最优调度决策,并以此计算期望运行成本和(或)负荷损失成本作为第一阶段成本的一部分。特别地,利用l型算法得到了资源扩展规划问题的最优解。多个实例的仿真结果表明,多区域智能电网的最优扩容方案确实取决于预期风力发电、现有发电容量和输电容量的不确定性水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Smarter security in the smart grid AMI threats, intrusion detection requirements and deployment recommendations Multi-area state estimation using distributed SDP for nonlinear power systems Cooperative closed-loop techniques for optimized transmission applied to a WSN in a power substation Reduced-order synchrophasor-assisted state estimation for smart grids
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1