Kajian Rencana Teknis dan Anggaran Biaya Reklamasi Tambang pada Penambangan Nikel PT Manusela Prima Mining di Desa Piru, Kabupaten Seram Bagian Barat, Provinsi Maluku

Muhammad Faiq Syahdan Banama, Zaenal, Noor Fauzi Isniarno
{"title":"Kajian Rencana Teknis dan Anggaran Biaya Reklamasi Tambang pada Penambangan Nikel PT Manusela Prima Mining di Desa Piru, Kabupaten Seram Bagian Barat, Provinsi Maluku","authors":"Muhammad Faiq Syahdan Banama, Zaenal, Noor Fauzi Isniarno","doi":"10.29313/bcsme.v3i1.6161","DOIUrl":null,"url":null,"abstract":"Abstract. PT Manusela Prima Mining is a company engaged in nickel mining located in Piru Village, West Seram Regency, Maluku Province. Land that has been mined will be reclamated with the stages of land arrangement, revegetation, maintenance to plant maintenance and the total cost of reclamation. The purpose of this research is to find out the technical plans for land management, revegetation and care and maintenance in areas of former nickel mining activities. The data that will be needed is the productivity of mechanical equipment, reclamation area, compaction material (topsoil and overburden), land planning time, fuel data, revegetation costs, to be able to find out the total reclamation budget. The technical scheme plan for land use stewardship from 2023-2029 will be carried out in an area of ​​reclamation area and in accordance with a mining land area of ​​8.78 Ha. The stages of land use stewardship were carried out using Kobelco SK200 Excavator mechanical devices, Komatsu D85E-SS Bulldozers and Hino 500-FM260TI Dumptrucks with a requirement of 131,700 LCM topsoil compaction material and 439,000 LCM overburden. Then the revegetation stage uses staple crops in the form of acacia trees (Acacia mangium), insert plants in the form of cashew trees (Anacardium occidentale) and banana trees (Parkia speciose) and for cover crops in the form of nuts (mucuna bracteate). This plan will be carried out up to the maintenance and care stage to achieve 100% success for reclamation activities. Based on the research results, it can be concluded that PT Manusela Prima Mining with a mining business license (IUP) ends in 2029 and reclamation activities last until 2029 with a total reclamation budget of Rp 2,594,925,351. Abstrak. PT Manusela Prima Mining merupakan perusahaan yang bergerak di bidang pertambangan nikel yang berlokasi di Desa Piru, Kabupaten Seram Bagian Barat, Provinsi Maluku. Lahan yang sudah ditambang akan dilakukan reklamasi dengan tahapan penataan lahan, revegetasi, perawatan hingga pemeliharaan tanaman dan total biaya reklamasi. Tujuan dari penelitian ini agar dapat mengetahui rencana teknis penataan lahan, revegetasi serta perawatan dan pemeliharaan pada area bekas kegiatan penambangan nikel. Data yang akan dibutuhkan yaitu produktivitas alat mekanis, luas lahan reklamasi, material pemadatan (topsoil dan overburden), waktu penataan lahan, data bahan bakar, biaya revegetasi, untuk dapat mengetahui anggaran biaya total reklamasi. Rencana skema teknis untuk penatagunaan lahan dari tahun 2023-2029 yang dilakukan pada luas area reklamasi dan sesuai dengan luas lahan penambangan sebesar 8,78 Ha. Tahapan penatagunaan lahan di lakukan dengan menggunakan alat mekanis Excavator Kobelco SK200, Bulldozer Komatsu D85E-SS dan Dumptruck Hino 500-FM260TI dengan kebutuhan material pemadatan topsoil 131.700 LCM dan overburden 439.000 LCM. Kemudian tahapan revegetasi menggunakan tanaman pokok berupa pohon akasia (acacia mangium), tanaman sisipan berupa pohon jambu mete (anacardium occidentale) dan pohon pete (parkia speciose) dan untuk tanaman penutup berupa kacang-kacangan (mucuna bracteate). Rencana ini akan dilakukan sampai dengan tahap pemeliharaan dan perawatan hingga mencapai keberhasilan 100% untuk kegiatan reklamasi. Berdasarkan hasil penelitian dapat disimpulkan pada PT Manusela Prima Mining dengan izin usaha pertambangan (IUP) berakhir pada 2029 dan kegiatan reklamasi berlangsung hingga tahun 2029 dengan total anggaran biaya reklamasi yaitu Rp 2.594.925.351,-.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v3i1.6161","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract. PT Manusela Prima Mining is a company engaged in nickel mining located in Piru Village, West Seram Regency, Maluku Province. Land that has been mined will be reclamated with the stages of land arrangement, revegetation, maintenance to plant maintenance and the total cost of reclamation. The purpose of this research is to find out the technical plans for land management, revegetation and care and maintenance in areas of former nickel mining activities. The data that will be needed is the productivity of mechanical equipment, reclamation area, compaction material (topsoil and overburden), land planning time, fuel data, revegetation costs, to be able to find out the total reclamation budget. The technical scheme plan for land use stewardship from 2023-2029 will be carried out in an area of ​​reclamation area and in accordance with a mining land area of ​​8.78 Ha. The stages of land use stewardship were carried out using Kobelco SK200 Excavator mechanical devices, Komatsu D85E-SS Bulldozers and Hino 500-FM260TI Dumptrucks with a requirement of 131,700 LCM topsoil compaction material and 439,000 LCM overburden. Then the revegetation stage uses staple crops in the form of acacia trees (Acacia mangium), insert plants in the form of cashew trees (Anacardium occidentale) and banana trees (Parkia speciose) and for cover crops in the form of nuts (mucuna bracteate). This plan will be carried out up to the maintenance and care stage to achieve 100% success for reclamation activities. Based on the research results, it can be concluded that PT Manusela Prima Mining with a mining business license (IUP) ends in 2029 and reclamation activities last until 2029 with a total reclamation budget of Rp 2,594,925,351. Abstrak. PT Manusela Prima Mining merupakan perusahaan yang bergerak di bidang pertambangan nikel yang berlokasi di Desa Piru, Kabupaten Seram Bagian Barat, Provinsi Maluku. Lahan yang sudah ditambang akan dilakukan reklamasi dengan tahapan penataan lahan, revegetasi, perawatan hingga pemeliharaan tanaman dan total biaya reklamasi. Tujuan dari penelitian ini agar dapat mengetahui rencana teknis penataan lahan, revegetasi serta perawatan dan pemeliharaan pada area bekas kegiatan penambangan nikel. Data yang akan dibutuhkan yaitu produktivitas alat mekanis, luas lahan reklamasi, material pemadatan (topsoil dan overburden), waktu penataan lahan, data bahan bakar, biaya revegetasi, untuk dapat mengetahui anggaran biaya total reklamasi. Rencana skema teknis untuk penatagunaan lahan dari tahun 2023-2029 yang dilakukan pada luas area reklamasi dan sesuai dengan luas lahan penambangan sebesar 8,78 Ha. Tahapan penatagunaan lahan di lakukan dengan menggunakan alat mekanis Excavator Kobelco SK200, Bulldozer Komatsu D85E-SS dan Dumptruck Hino 500-FM260TI dengan kebutuhan material pemadatan topsoil 131.700 LCM dan overburden 439.000 LCM. Kemudian tahapan revegetasi menggunakan tanaman pokok berupa pohon akasia (acacia mangium), tanaman sisipan berupa pohon jambu mete (anacardium occidentale) dan pohon pete (parkia speciose) dan untuk tanaman penutup berupa kacang-kacangan (mucuna bracteate). Rencana ini akan dilakukan sampai dengan tahap pemeliharaan dan perawatan hingga mencapai keberhasilan 100% untuk kegiatan reklamasi. Berdasarkan hasil penelitian dapat disimpulkan pada PT Manusela Prima Mining dengan izin usaha pertambangan (IUP) berakhir pada 2029 dan kegiatan reklamasi berlangsung hingga tahun 2029 dengan total anggaran biaya reklamasi yaitu Rp 2.594.925.351,-.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
马鲁库省皮鲁区西克里库区皮鲁村的矿山回收技术计划和预算预算
摘要PT Manusela Prima Mining是一家从事镍矿开采的公司,位于马鲁古省西Seram Regency的Piru村。对已开采的土地进行复垦,按照土地整理、植被恢复、维护到植物维护的阶段和复垦总费用进行复垦。这项研究的目的是找出以前镍采矿活动地区的土地管理、植被恢复、照料和维持的技术计划。需要的数据是机械设备的生产率、复垦面积、压实材料(表土和覆盖层)、土地规划时间、燃料数据、植被恢复成本,以便能够找出总的复垦预算。2023-2029年土地利用管理技术方案计划将在复垦区范围内,按照8.78 Ha的矿山用地面积进行。土地利用管理阶段使用神钢SK200挖掘机机械设备,小松D85E-SS推土机和日野500-FM260TI自卸车进行,要求表层土压实材料13.17万LCM,覆盖层43.9万LCM。然后,在植被恢复阶段,以金合欢树(acacia mangium)的形式种植主要作物,以腰果树(Anacardium occidentale)和香蕉树(Parkia speciose)的形式种植插入植物,并以坚果(mucuna bracteate)的形式作为覆盖作物。此计划将一直执行至维修保养阶段,以确保填海活动100%成功。根据研究结果,可以得出结论,拥有采矿营业执照(IUP)的PT Manusela Prima Mining将于2029年结束,复垦活动将持续到2029年,复垦预算总额为2,594,925,351卢比。Abstrak。PT Manusela Prima Mining merupakan perusahaan yang bergerak di bidang pertambangan nickel yang berlokasi Desa Piru, Kabupaten Seram Bagian Barat,省马鲁古。拉汗阳sudah ditambang akan dilakukan reklamasi dengan tahapan penataan Lahan, regegetasi, perawatan hinga pemeliharaan tanaman dan total biaya reklamasi。Tujuan dari penelitian ini agar dapat mengetahui rencana teknis penataan lahan, revegetasi serta perawatan dan pemeliharaan pada area bekas kegiatan penambangan nikel。Data yang akan dibutuhkan yitu producktivitas alat mekanis, luas lahan reklamasi, material pemadatan(表土和覆盖层),waktu penataan lahan, Data bahan bakar, biaya revegetasi, untuk dapat mengetahui anggaran biaya total reklamasi。Rencana skema teknis untuk penatagunaan lahan dari tahun 2023-2029 yang dilakukan pada luas area reklamasi dan sesuai dengan luas lahan penambangan sebesar 8,78 Ha。挖掘机神钢SK200,推土机小松D85E-SS丹自卸车日野500-FM260TI登干克布土料表层土131.700 LCM丹覆盖层439.000 LCM。Kemudian tahapan regetasi menggunakan tanaman pokok berupa pohon akasia (mangium), tanaman sisipan berupa pohon jambu mete (anacardium occidentale), pohon pete (parkia species), untuk tanaman penutup berupa kacang-kacangan (mucuna breteate)。我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说,我是说。Berdasarkan hasil penelitian dapat dispulpulkan pada PT Manusela Prima矿业公司(IUP) berakhir pada 2029 dan kegiatan reklamasi berlangsung hingga tahun 2029 dengan total anggaran biaya reklamasi yitu Rp 2.594.925.351,-。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Kajian Kelayakan Ekonomi pada Kegiatan Hauling Tambang Tanah Liat PT Indocement Tunggal Prakarsa TBK Blok Pabuaran di Kecamatan Sukamakmur Kabupaten Bogor Provinsi Jawa Barat Analisis Investasi dan Kelayakan Ekonomi pada Penambangan Sirtu CV Billiant Ningrat di Kecamatan Leles Kabupaten Garut Provinsi Jawa Barat Manajemen Stockpile untuk Mencegah Terjadinya Self-Combustion di PLTU Banten 2 Labuan OMU Monitoring Korosi Discharge Conveyor F pada Tambang Batubara PT XYZ di Kabupaten Merangin Provinsi Jambi Pengaruh Bidang Diskontinu Terhadap Potensi Longsoran Baji pada Lereng Tambang Terbuka di PT Indocement Tunggal Prakarsa Desa Palimanan, Kecamatan Gempol, Kabupaten Cirebon, Provinsi Jawa Barat
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1