Usulan Perbaikan Proses Cross Drainage untuk Mempercepat Waktu Proyek Pembangunan Jalan Raya

M. Shofa, Lanis Listiyana, Dadi Cahyadi
{"title":"Usulan Perbaikan Proses Cross Drainage untuk Mempercepat Waktu Proyek Pembangunan Jalan Raya","authors":"M. Shofa, Lanis Listiyana, Dadi Cahyadi","doi":"10.30656/INTECH.V4I2.1054","DOIUrl":null,"url":null,"abstract":"The success of the project can be judged by the timeliness of the planned target. The problem in the highway project is in the difference between cross drainage age implementation and the age of the project plan that has been set, so that, the project becomes not timely. This research aims to evaluate the critical path of cross drainage project, and what improvements are appropriate in the framework of project acceleration. The Critical Path Method (CPM) method is used to determine the critical path of the cross drainage project activity, from which critical path will be analyzed by using the Fishbone Diagram. Furthermore, borda technique is used to determine the appropriate improvement.","PeriodicalId":120847,"journal":{"name":"Jurnal INTECH Teknik Industri Universitas Serang Raya","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal INTECH Teknik Industri Universitas Serang Raya","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30656/INTECH.V4I2.1054","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

The success of the project can be judged by the timeliness of the planned target. The problem in the highway project is in the difference between cross drainage age implementation and the age of the project plan that has been set, so that, the project becomes not timely. This research aims to evaluate the critical path of cross drainage project, and what improvements are appropriate in the framework of project acceleration. The Critical Path Method (CPM) method is used to determine the critical path of the cross drainage project activity, from which critical path will be analyzed by using the Fishbone Diagram. Furthermore, borda technique is used to determine the appropriate improvement.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
建议改进污水处理程序,加快高速公路建设项目的时间
项目的成功可以通过计划目标的及时性来判断。高速公路工程中存在的问题是交叉排水年龄的实施与已设定的工程计划年龄存在差异,从而使工程变得不及时。本研究旨在评估交叉排水工程的关键路径,以及在工程加速框架下应采取的改进措施。关键路径法(Critical Path Method, CPM)用于确定交叉排水工程活动的关键路径,并利用鱼骨图对关键路径进行分析。此外,采用borda技术确定适当的改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Perancangan Ulang Tata Letak Fasilitas Produksi Menggunakan Modified Squirrel Search Algorithm Analisis Just in Time Tender Maintenance Boiler terhadap Nilai Jual Crude Oil dengan Metode Value Stream Mapping Analisis Pemilihan Pemasok Bahan Baku Soda Ash Menggunakan Metode Analytical Network Process Evaluasi Kelelahan Subjektif Sopir Bus Rapid Transfer (BRT) di Kota Denpasar Analisis Kepuasan Kualitas dan Rancangan Perbaikan Pelayanan Jasa Kesehatan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1