ASSESSMENT OF BIM USE IN THE EARLY STAGES OF IMPLEMENTATION

Karen Arellano Escobar, Alexis Iván Andrade Valles, Tito Castillo, R. Herrera
{"title":"ASSESSMENT OF BIM USE IN THE EARLY STAGES OF IMPLEMENTATION","authors":"Karen Arellano Escobar, Alexis Iván Andrade Valles, Tito Castillo, R. Herrera","doi":"10.7764/ric.00005.21","DOIUrl":null,"url":null,"abstract":"The construction companies have achieved different levels of BIM use and in some developed countries, it is very advanced. Traditionally, the use of BIM has been evaluated by maturity models; however, it does not provide an integral evaluation of BIM use. BIM Use Assessment (BUA) was proposed as a tool to satisfy this need, it is based on the evaluation of several states that compose necessary characteristics to perform each BIM use successfully. BUA was applied to measure projects that have BIM advanced use in Colombia, Chile, and Spain. However, there is none an integral evaluation in the early stages of BIM use. Therefore, the objective of this research was to evaluate the incipient BIM use. Accordingly, 23 private Ecuadorian projects, were evaluated using BUA. As expected, the analyzed projects have lower levels than the other projects evaluated by BUA. The high percentage of projects were at the levels that require the appropriate use of 3D models, and the collaboration issues were common deficiencies. This research results could be used in the development of strategies to reduce mistakes; thus, leading to an agile BIM implementation.","PeriodicalId":369360,"journal":{"name":"Revista Ingeniería de Construcción","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista Ingeniería de Construcción","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7764/ric.00005.21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The construction companies have achieved different levels of BIM use and in some developed countries, it is very advanced. Traditionally, the use of BIM has been evaluated by maturity models; however, it does not provide an integral evaluation of BIM use. BIM Use Assessment (BUA) was proposed as a tool to satisfy this need, it is based on the evaluation of several states that compose necessary characteristics to perform each BIM use successfully. BUA was applied to measure projects that have BIM advanced use in Colombia, Chile, and Spain. However, there is none an integral evaluation in the early stages of BIM use. Therefore, the objective of this research was to evaluate the incipient BIM use. Accordingly, 23 private Ecuadorian projects, were evaluated using BUA. As expected, the analyzed projects have lower levels than the other projects evaluated by BUA. The high percentage of projects were at the levels that require the appropriate use of 3D models, and the collaboration issues were common deficiencies. This research results could be used in the development of strategies to reduce mistakes; thus, leading to an agile BIM implementation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在实施的早期阶段评估他的使用情况
建筑公司已经实现了不同程度的BIM使用,在一些发达国家,它是非常先进的。传统上,BIM的使用是通过成熟度模型来评估的;然而,它并没有提供BIM使用的整体评估。BIM使用评估(BUA)被提出作为满足这一需求的工具,它基于对几个状态的评估,这些状态构成了成功执行每个BIM使用的必要特征。在哥伦比亚、智利和西班牙,BUA被用于衡量BIM先进应用的项目。然而,在BIM使用的早期阶段没有一个完整的评估。因此,本研究的目的是评估早期BIM的使用。因此,使用BUA对23个厄瓜多尔私人项目进行了评价。正如预期的那样,分析的项目比BUA评估的其他项目具有更低的水平。高比例的项目需要适当使用3D模型,而协作问题是常见的缺陷。该研究结果可用于制定减少错误的策略;因此,导致敏捷的BIM实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Lean in the Public Sector. The lean journey of the finnish real estate. Developing a new procurement model, using behavioural economics, to enable continuous improvement of productivity and better value in large UK infrastructure projects. Lean Methodologies and Productivity in Mining Development – A Case in a Public Company. Key lessons learned from adopting relational principles in the public sector: a case study in california.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1