Understanding need of "Uncertainty Analysis" in the system Design process

Kardile Vilas Vasantrao
{"title":"Understanding need of \"Uncertainty Analysis\" in the system Design process","authors":"Kardile Vilas Vasantrao","doi":"10.5121/IJSEA.2011.2307","DOIUrl":null,"url":null,"abstract":"Software project development process is requiring accurate software cost and schedule estimation for achieve goal or success. A lot it referred to as the \"Intricate brainteaser\" because of its conscience attribute which is impact by complexity and uncertainty, Generally estimation is not as difficult or puzzling as people think. In fact, generating accurate estimates is straightforward-once you understand the intensity of uncertainty and module which contribute itself process. In our everyday life, we enhance our estimation based on past experience in which problem solve by which method and in which condition and which opportune provide that method to produce better result . So, Instead of unexplained treatises and inflexible modeling techniques, this will guide highlights a proven set of procedures, understandable formulas, and heuristics that individuals and complete team can apply to their projects to help achieve estimation ability with choose appropriate development approaches In the early stage of software life cycle project manager are inefficient to estimate the effort, schedule, cost estimation and its development approach .This in turn, confuses the manager to bid effectively on software project and choose incorrect development approach. That will directly effect on productivity cycle and increase level of uncertainty. This becomes a strong cause of project failure. So to avoid such problem if we know level and sources of uncertainty in model design, It will directive the developer to design accurate software cost and schedule estimation. which are require l for software project success. This paper demonstrates need of uncertainty analysis module at the modeling process for assist to recognize modular uncertainty system development process and the role of uncertainty at different stages in the modeling","PeriodicalId":381434,"journal":{"name":"arXiv: Software Engineering","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"arXiv: Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5121/IJSEA.2011.2307","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Software project development process is requiring accurate software cost and schedule estimation for achieve goal or success. A lot it referred to as the "Intricate brainteaser" because of its conscience attribute which is impact by complexity and uncertainty, Generally estimation is not as difficult or puzzling as people think. In fact, generating accurate estimates is straightforward-once you understand the intensity of uncertainty and module which contribute itself process. In our everyday life, we enhance our estimation based on past experience in which problem solve by which method and in which condition and which opportune provide that method to produce better result . So, Instead of unexplained treatises and inflexible modeling techniques, this will guide highlights a proven set of procedures, understandable formulas, and heuristics that individuals and complete team can apply to their projects to help achieve estimation ability with choose appropriate development approaches In the early stage of software life cycle project manager are inefficient to estimate the effort, schedule, cost estimation and its development approach .This in turn, confuses the manager to bid effectively on software project and choose incorrect development approach. That will directly effect on productivity cycle and increase level of uncertainty. This becomes a strong cause of project failure. So to avoid such problem if we know level and sources of uncertainty in model design, It will directive the developer to design accurate software cost and schedule estimation. which are require l for software project success. This paper demonstrates need of uncertainty analysis module at the modeling process for assist to recognize modular uncertainty system development process and the role of uncertainty at different stages in the modeling
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
了解“不确定性分析”在系统设计过程中的必要性
软件项目开发过程需要对软件成本和进度进行准确的估计,以实现目标或取得成功。它被称为“复杂的脑筋急转弯”,因为它的良心属性受复杂性和不确定性的影响,通常估计并不像人们想象的那么困难或令人困惑。事实上,生成准确的估计是很简单的——一旦您了解了不确定性的强度和贡献自身过程的模块。在我们的日常生活中,我们根据过去的经验来提高我们的估计,在哪个问题用哪个方法解决,在什么条件下,什么时机提供这种方法来产生更好的结果。因此,代替解释的论文和不灵活的建模技术,本指南将强调一套经过验证的过程,可理解的公式,以及启发式,个人和整个团队可以应用于他们的项目,以帮助通过选择适当的开发方法来实现评估能力。在软件生命周期的早期阶段,项目经理在评估工作量,进度,成本评估及其开发方法方面效率低下。在软件项目中有效地误导管理者投标,选择不正确的开发方法。这将直接影响到生产周期,增加不确定性。这成为项目失败的一个重要原因。因此,了解模型设计中不确定性的程度和来源,将指导开发人员设计出准确的软件成本和进度估算。这些都是软件项目成功所必需的。本文论证了不确定性分析模块在建模过程中的必要性,以帮助识别模块化不确定性系统的开发过程,以及不确定性在建模过程中不同阶段的作用
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Natural Language Processing (NLP) for Requirements Engineering: A Systematic Mapping Study Dataset Basis to Develop a Platform for Multiple-Scale Complex Systems Modeling and Visualization: MoNet Jolie Static Type Checker: a prototype Reproducibility in Research: Systems, Infrastructure, Culture Proceedings 1st Workshop on Formal Integrated Development Environment
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1