Are Prototypes Good for the Budget

T. Plunkett
{"title":"Are Prototypes Good for the Budget","authors":"T. Plunkett","doi":"10.1108/09642369210063036","DOIUrl":null,"url":null,"abstract":"As concurrent engineering helps to reduce project lead times, tools are also required to control risk. Centres on a case study of a telephone, ultimately for British Telecom that was developed during 1993. Stereolithography and rapid prototyping were accessed via Formation Engineering on a bureau basis to provide a dramatic reduction in the product development cycle while simultaneously reducing risk. The justification for prototyping being sustainable on time, risk or financial grounds. It is, however, usually the economics debate that rages for longest as the justification of prototypes is frequently sought within the design phase and not the project as a whole. Incorporating loss of profits due to delayed sales will introduce at least an order of magnitude difference, making the real decision a “no brainer”.","PeriodicalId":113037,"journal":{"name":"World Class Design To Manufacture","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Class Design To Manufacture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/09642369210063036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

As concurrent engineering helps to reduce project lead times, tools are also required to control risk. Centres on a case study of a telephone, ultimately for British Telecom that was developed during 1993. Stereolithography and rapid prototyping were accessed via Formation Engineering on a bureau basis to provide a dramatic reduction in the product development cycle while simultaneously reducing risk. The justification for prototyping being sustainable on time, risk or financial grounds. It is, however, usually the economics debate that rages for longest as the justification of prototypes is frequently sought within the design phase and not the project as a whole. Incorporating loss of profits due to delayed sales will introduce at least an order of magnitude difference, making the real decision a “no brainer”.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
原型对预算有利吗
由于并行工程有助于减少项目交付时间,还需要工具来控制风险。中心是一个电话的案例研究,最终为英国电信在1993年期间开发。立体光刻技术和快速成型技术在地层工程部门的基础上得到了应用,从而大大缩短了产品开发周期,同时降低了风险。在时间、风险或财务方面,原型设计是可持续的。然而,通常是经济方面的争论持续时间最长,因为原型的论证经常在设计阶段进行,而不是在整个项目中进行。将由于延迟销售而造成的利润损失考虑在内,至少会带来一个数量级的差异,从而使真正的决策变得“无需动脑筋”。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Time‐to‐market: time equals money – but where does it all go? Achieving growth, competitive advantage and increased profits Breathing easier with DFMA Transforming the vision Implementing ecological product design
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1