Shore-To-Ship Power Supply System for a Cruise Ship

D. Paul, Vahik Haddian
{"title":"Shore-To-Ship Power Supply System for a Cruise Ship","authors":"D. Paul, Vahik Haddian","doi":"10.1109/IAS.2009.5324883","DOIUrl":null,"url":null,"abstract":"The power demand for a large cruise ship during berthing is close to 10 MVA. Such a power demand from the shore-to-ship requires multiple parallel feeds at medium voltage to match with the ship’s connection point voltage. The cruise ship authority required installation of a neutral grounding disconnect switch (DS) and insulated ground conductor (IG) at the shore power transformer neutral grounding resistor (NGR) such that during cold ironing the DS will be opened to complete the shore-side, line-to-ground fault current path through the equipment grounding conductor to reach the ship hull first before it returns to the transformer neutral via IG and NGR. Such an installation of the DS appears to violate National Electrical Code (NEC) [1] requirements of a power system grounding. For clarification of this issue, this paper provide example of a ground fault at the shore and a ground fault at the ship using DS and IG in the system. The need to know the ship’s on-board homo-polar grounding-equipment ratings and the ship’s system-charging current in designing shore-power-system grounding is discussed. This paper will provide input for the present IEEE and IEC draft standards on Cold Ironing [2] [12]. Index Terms — cable management system, cathodic protection, ground-fault relay, homo-polar grounding, insulated grounding conductor, neutral-grounding resistor, power plugs, shore power, system-charging current","PeriodicalId":178685,"journal":{"name":"2009 IEEE Industry Applications Society Annual Meeting","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE Industry Applications Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2009.5324883","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

Abstract

The power demand for a large cruise ship during berthing is close to 10 MVA. Such a power demand from the shore-to-ship requires multiple parallel feeds at medium voltage to match with the ship’s connection point voltage. The cruise ship authority required installation of a neutral grounding disconnect switch (DS) and insulated ground conductor (IG) at the shore power transformer neutral grounding resistor (NGR) such that during cold ironing the DS will be opened to complete the shore-side, line-to-ground fault current path through the equipment grounding conductor to reach the ship hull first before it returns to the transformer neutral via IG and NGR. Such an installation of the DS appears to violate National Electrical Code (NEC) [1] requirements of a power system grounding. For clarification of this issue, this paper provide example of a ground fault at the shore and a ground fault at the ship using DS and IG in the system. The need to know the ship’s on-board homo-polar grounding-equipment ratings and the ship’s system-charging current in designing shore-power-system grounding is discussed. This paper will provide input for the present IEEE and IEC draft standards on Cold Ironing [2] [12]. Index Terms — cable management system, cathodic protection, ground-fault relay, homo-polar grounding, insulated grounding conductor, neutral-grounding resistor, power plugs, shore power, system-charging current
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
游轮岸船供电系统
一艘大型游轮在靠泊期间的电力需求接近10 MVA。这种从岸到船的电力需求需要多个中压并联馈电,以匹配船舶的连接点电压。游轮当局要求在岸上电力变压器中性点接地电阻(NGR)上安装一个中性点接地断开开关(DS)和绝缘接地导体(IG),这样在冷熨期间,DS将被打开,以完成岸上的线路到地故障电流路径,通过设备接地导体首先到达船体,然后通过IG和NGR返回变压器中性点。DS的这种安装似乎违反了国家电气规范(NEC)[1]对电力系统接地的要求。为了澄清这一问题,本文提供了岸上接地故障和船上接地故障的实例,并在系统中使用了DS和IG。讨论了岸电系统接地设计中需要了解船载同极接地设备额定值和船载系统充电电流。本文将为目前IEEE和IEC关于冷熨烫的标准草案[2][12]提供输入。索引术语-电缆管理系统,阴极保护,接地故障继电器,同极接地,绝缘接地导体,中性接地电阻,电源插头,岸电,系统充电电流
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Contribution to Determination of Domain of Attraction in Power Systems: Application to Drives with Input Filter Modified Synchronous Reference Frame Strategy for Selective-Tuned Single Phase Hybrid Active Power Filter Electrical and Thermal Analysis of Parallel Single-Conductor Cable Installations Nozzleless EHD Spraying for Fine Droplet Production in Liquid-In-Liquid System Universal Input Voltage Self-Oscillating Electronic Ballast with Feedforward Control
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1