{"title":"Mitigating Murphy's Law While Test - Volume 1","authors":"F. Dollinger","doi":"10.1109/eic.2018.8481112","DOIUrl":null,"url":null,"abstract":"At Haefely Hipotronics, we have seen and have even surprisingly discovered situations, in which tests were performed in an improper way: typically Murphy's Law. Various causes are involved, such as misinterpretation of standard (IEC/IEEE), or misinterpretation of the instrument settings, or inadequate instrumentation or test system. Performing tests improperly can lead measurements that do not conform to the applicable (IEC/IEEE) standard or may produce wrong measurement results, that may even damage the test object, test system, or cause injury to the operator. This presentation is a summary of some situations that have been seen onsite, covering tests like partial discharge measurement, loss measurement and lightning impulse test.","PeriodicalId":184139,"journal":{"name":"2018 IEEE Electrical Insulation Conference (EIC)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Electrical Insulation Conference (EIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/eic.2018.8481112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
At Haefely Hipotronics, we have seen and have even surprisingly discovered situations, in which tests were performed in an improper way: typically Murphy's Law. Various causes are involved, such as misinterpretation of standard (IEC/IEEE), or misinterpretation of the instrument settings, or inadequate instrumentation or test system. Performing tests improperly can lead measurements that do not conform to the applicable (IEC/IEEE) standard or may produce wrong measurement results, that may even damage the test object, test system, or cause injury to the operator. This presentation is a summary of some situations that have been seen onsite, covering tests like partial discharge measurement, loss measurement and lightning impulse test.