Managing Flow Dependencies: The "Missing Link" in Co-ordinating Distributed Teams in Large-Scale Development Projects

Wendy K. Ivins
{"title":"Managing Flow Dependencies: The \"Missing Link\" in Co-ordinating Distributed Teams in Large-Scale Development Projects","authors":"Wendy K. Ivins","doi":"10.1109/WETICE.2008.41","DOIUrl":null,"url":null,"abstract":"Distributed team members working in large-scale development projects would benefit from effective process support for co-ordinating their activities with the work of other team members. However, many of the techniques used to model and enact processes have a \"missing link\" as they do not explicitly consider the co-ordination activities needed to manage flow dependencies that arise from the fragmentation of the work. This can result in unnecessary rework and delays if informal and ad-hoc coordination is used to manage transitions between activities. We propose using explicit coordination processes to manage flow dependencies which address coordination problems associated with product development workflows.","PeriodicalId":259447,"journal":{"name":"2008 IEEE 17th Workshop on Enabling Technologies: Infrastructure for Collaborative Enterprises","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE 17th Workshop on Enabling Technologies: Infrastructure for Collaborative Enterprises","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WETICE.2008.41","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Distributed team members working in large-scale development projects would benefit from effective process support for co-ordinating their activities with the work of other team members. However, many of the techniques used to model and enact processes have a "missing link" as they do not explicitly consider the co-ordination activities needed to manage flow dependencies that arise from the fragmentation of the work. This can result in unnecessary rework and delays if informal and ad-hoc coordination is used to manage transitions between activities. We propose using explicit coordination processes to manage flow dependencies which address coordination problems associated with product development workflows.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
管理流依赖关系:大型开发项目中协调分布式团队的“缺失环节”
在大型开发项目中工作的分布式团队成员将受益于有效的过程支持,以协调他们的活动与其他团队成员的工作。然而,许多用于建模和制定流程的技术都有一个“缺失的环节”,因为它们没有明确考虑管理由工作碎片产生的流依赖所需的协调活动。如果使用非正式和特别的协调来管理活动之间的转换,这可能会导致不必要的返工和延迟。我们建议使用明确的协调过程来管理处理与产品开发工作流相关的协调问题的流依赖关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
GRIPLAB 1.0: Grid Image Processing Laboratory for Distributed Machine Vision Applications Adaptive Process Management. Issues and (Some) Solutions A Sybil-Resistant Admission Control Coupling SybilGuard with Distributed Certification Cooperative Behavior of Artificial Neural Agents Based on Evolutionary Architectures An Agent-Based Approach for Composition of Semantic Web Services
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1