Study on Installation of Neutral Ground Resistance in Very Small Power Plant Transformer

P. Chiradeja, C. Pothisarn, Panu Srisuksai, Suntiti Yoomak, A. Ngaopitakkul, Natthanon Phannil
{"title":"Study on Installation of Neutral Ground Resistance in Very Small Power Plant Transformer","authors":"P. Chiradeja, C. Pothisarn, Panu Srisuksai, Suntiti Yoomak, A. Ngaopitakkul, Natthanon Phannil","doi":"10.1109/IAS54023.2022.9939721","DOIUrl":null,"url":null,"abstract":"Faults in the distribution system of the Thai electrical system occur frequently. Such faults directly affect the protective equipment of the distribution system. The protective device disconnects the circuit unnecessarily on many occasions because it detects a higher current than expected. In this study, a 22-kV distribution system and a very small power plant (VSPP) were connected. The system consists of two feeders. Feeder 1 supplies electricity directly to the load; a fault was enforced in this feeder. Feeder 2 supplies electricity directly to the load; the VSPP was connected to this feeder. The fault in Feeder 1 was simulated, and the behavior of the defense system was studied. Unnecessary disconnection of the VSPP circuit took place because the high fault current caused the overcurrent protection relay to operate instantaneously. Therefore, a neutral ground resistance was installed at the VSPP transformer to reduce the fault current, extend the relay operating time to the delay range, and reduce unnecessary disconnections of the overcurrent protection relay of the VSPP. In addition, when a fault occurs in the distribution system, the faulted phase voltage decreases, whereas the non-faulted phase voltage increases. Surge arresters and voltage transformers must be able to withstand an increase in voltage. This is also explained and discussed in this paper.","PeriodicalId":193587,"journal":{"name":"2022 IEEE Industry Applications Society Annual Meeting (IAS)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE Industry Applications Society Annual Meeting (IAS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS54023.2022.9939721","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Faults in the distribution system of the Thai electrical system occur frequently. Such faults directly affect the protective equipment of the distribution system. The protective device disconnects the circuit unnecessarily on many occasions because it detects a higher current than expected. In this study, a 22-kV distribution system and a very small power plant (VSPP) were connected. The system consists of two feeders. Feeder 1 supplies electricity directly to the load; a fault was enforced in this feeder. Feeder 2 supplies electricity directly to the load; the VSPP was connected to this feeder. The fault in Feeder 1 was simulated, and the behavior of the defense system was studied. Unnecessary disconnection of the VSPP circuit took place because the high fault current caused the overcurrent protection relay to operate instantaneously. Therefore, a neutral ground resistance was installed at the VSPP transformer to reduce the fault current, extend the relay operating time to the delay range, and reduce unnecessary disconnections of the overcurrent protection relay of the VSPP. In addition, when a fault occurs in the distribution system, the faulted phase voltage decreases, whereas the non-faulted phase voltage increases. Surge arresters and voltage transformers must be able to withstand an increase in voltage. This is also explained and discussed in this paper.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
小型发电厂变压器中性点接地电阻的安装研究
泰国电力系统配电系统故障频繁。此类故障直接影响配电系统的保护设备。在许多情况下,保护装置会因为检测到比预期更高的电流而不必要地断开电路。在本研究中,连接了一个22kv配电系统和一个非常小的发电厂(VSPP)。该系统由两条馈线组成。馈线1直接向负载供电;这台馈线出现了故障。馈线2直接向负载供电;VSPP连接到这个馈线。对馈线1的故障进行了仿真,研究了防御系统的行为。由于故障电流过大导致过流保护继电器瞬间动作,导致VSPP电路不必要的断开。因此,在VSPP变压器处安装中性点接地电阻,以减小故障电流,将继电器动作时间延长到延时范围,减少VSPP过流保护继电器不必要的断开。此外,当配电系统发生故障时,故障相电压降低,而非故障相电压升高。避雷器和电压互感器必须能够承受电压的升高。本文也对此进行了说明和讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Testing the resistance of conductive gloves for the evaluation of the efficiency of clothing protecting against induced currents Hybrid Machine Learning-based Intelligent Distance Protection and Control Schemes with Fault and Zonal Classification Capabilities for Grid-connected Wind Farms Hardware in the Loop Testing of Main and Backup Protection Scheme for Systems with High Penetration of Inverter-Based Resources Predictive Control of Seven Level Multi-level Inverter Based Single Phase Shunt Active Filter Influence of Ageing on Properties of Insulating Oil in In-Service Transformer and Reactors
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1