{"title":"Using the IT Capability Maturity Framework to Improve IT Capability and Value Creation: An Intel IT Case Study","authors":"M. Curley, Jim Kenneally","doi":"10.1109/EDOC.2011.32","DOIUrl":null,"url":null,"abstract":"This paper gives a short overview of the IT Capability Maturity Framework (IT-CMF) and describes how it was used between 2007-2009 to help Intel IT navigate and track progress on IT capability improvement and value contribution from IT, whilst negotiating a strategic transition for the IT organization which involved significant downsizing and budget reduction. The case study illustrates how the IT-CMF was used to measure capability improvements, provide business intelligence information and prioritized improvement recommendations. The paper also discusses how practices contained within the IT-CMF helped articulate a business value improvement whilst more traditional metrics of IT performance indicated a degradation in performance.","PeriodicalId":147466,"journal":{"name":"2011 IEEE 15th International Enterprise Distributed Object Computing Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE 15th International Enterprise Distributed Object Computing Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EDOC.2011.32","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12
Abstract
This paper gives a short overview of the IT Capability Maturity Framework (IT-CMF) and describes how it was used between 2007-2009 to help Intel IT navigate and track progress on IT capability improvement and value contribution from IT, whilst negotiating a strategic transition for the IT organization which involved significant downsizing and budget reduction. The case study illustrates how the IT-CMF was used to measure capability improvements, provide business intelligence information and prioritized improvement recommendations. The paper also discusses how practices contained within the IT-CMF helped articulate a business value improvement whilst more traditional metrics of IT performance indicated a degradation in performance.