Estimating Cost and Schedule of Reliability Improvement

D. A. Lee, E. A. Long
{"title":"Estimating Cost and Schedule of Reliability Improvement","authors":"D. A. Lee, E. A. Long","doi":"10.1080/1941658X.2011.627754","DOIUrl":null,"url":null,"abstract":"We extend a well-established model of reliability growth in a reliability improvement program, the Army Materiel Systems Analysis Activity Maturity Projection Model (AMPM), to include a model of the program's cost. We show how the extended model may be used to plan cost-optimal or schedule-optimal integrated programs of reliability improvement and testing, from early design through developmental and operational testing, and illustrate the process with an example from an actual program.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2011.627754","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

We extend a well-established model of reliability growth in a reliability improvement program, the Army Materiel Systems Analysis Activity Maturity Projection Model (AMPM), to include a model of the program's cost. We show how the extended model may be used to plan cost-optimal or schedule-optimal integrated programs of reliability improvement and testing, from early design through developmental and operational testing, and illustrate the process with an example from an actual program.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
成本估算和可靠性改进计划
我们在可靠性改进项目中扩展了一个完善的可靠性增长模型,即陆军装备系统分析活动成熟度预测模型(AMPM),以包括项目成本模型。我们展示了扩展模型如何用于规划成本最优或进度最优的可靠性改进和测试集成方案,从早期设计到开发和操作测试,并通过一个实际项目的例子说明了这一过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board EOV Multiproduct Cost-Volume-Profit Model: A Resource Reallocation Approach for Decision Making Dynamics of New Building Construction Costs: Implications for Forecasting Escalation Allowances Balancing Expert Opinion and Historical Data: The Case of Baseball Umpires Using Robust Statistical Methodology to Evaluate the Cost Performance of Project Delivery Systems: A Case Study of Horizontal Construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1