Reasonable exploitation solution for longwall in Seam L7 at East Side to ensure the stability of G9 surface works of Mong Duong Coal Mine

Tien Trung Vu, Son Anh Do, D. T. Le, H. D. Pham, Kien Trung Tran
{"title":"Reasonable exploitation solution for longwall in Seam L7 at East Side to ensure the stability of G9 surface works of Mong Duong Coal Mine","authors":"Tien Trung Vu, Son Anh Do, D. T. Le, H. D. Pham, Kien Trung Tran","doi":"10.46326/jmes.2022.63(6).08","DOIUrl":null,"url":null,"abstract":"When exploiting the working face located under the surface works need to be protected, it may lead to potential risks that cause unsafety and effect for the stability of those works. The degree of influence on the surface works depends on many factors, including the exploitation technology factor. It is always necessary to study and evaluate the impact of mining on the surface works to propose appropriate technical solutions and mining technology to ensure the safety during mining process. Through the field study at Mong Duong Coal Mine, finding a reasonable mining solution for the longwall in Seam L7 at East Side is important to ensure the stability of the G9 surface works. These works include a coal storage, and some construction works of level 4 houses, equipment and machinery for coal transportation and their total weight is estimated about 200,000 tons. Research methods used include numerical modeling method combined with comparative data analysis method. The authors have determined the heights of the collapse zone and fracture zone corresponding to the face advance of the longwall and the degree of influence on the surface works. These are considered as a basis for choosing a reasonable mining solution for the condition of the longwall to ensure the stability of the surface works. The above methods are applied to the condition of the longwall in Seam L7 at East Side of Mong Duong Coal Mine and find a reasonable exploitation for the longwall in Seam L7 with a cutting height of 2.2 m and recovering 100% of top coal (corresponding to 0.8 m). When the longwall is exploited in the strike direction to 140 m, the G9 surface works remain unaffected. When the longwall is exploited in the strike direction of 160 m onward, those works will be affected. The paper’s results are used as a basis for Mong Duong Coal Mine to choose a mining solution and to timely adjust the mining solution of the longwall in Seam L7, ensuring efficiency and stability for G9 surface works.","PeriodicalId":170167,"journal":{"name":"Journal of Mining and Earth Sciences","volume":"189 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining and Earth Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46326/jmes.2022.63(6).08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

When exploiting the working face located under the surface works need to be protected, it may lead to potential risks that cause unsafety and effect for the stability of those works. The degree of influence on the surface works depends on many factors, including the exploitation technology factor. It is always necessary to study and evaluate the impact of mining on the surface works to propose appropriate technical solutions and mining technology to ensure the safety during mining process. Through the field study at Mong Duong Coal Mine, finding a reasonable mining solution for the longwall in Seam L7 at East Side is important to ensure the stability of the G9 surface works. These works include a coal storage, and some construction works of level 4 houses, equipment and machinery for coal transportation and their total weight is estimated about 200,000 tons. Research methods used include numerical modeling method combined with comparative data analysis method. The authors have determined the heights of the collapse zone and fracture zone corresponding to the face advance of the longwall and the degree of influence on the surface works. These are considered as a basis for choosing a reasonable mining solution for the condition of the longwall to ensure the stability of the surface works. The above methods are applied to the condition of the longwall in Seam L7 at East Side of Mong Duong Coal Mine and find a reasonable exploitation for the longwall in Seam L7 with a cutting height of 2.2 m and recovering 100% of top coal (corresponding to 0.8 m). When the longwall is exploited in the strike direction to 140 m, the G9 surface works remain unaffected. When the longwall is exploited in the strike direction of 160 m onward, those works will be affected. The paper’s results are used as a basis for Mong Duong Coal Mine to choose a mining solution and to timely adjust the mining solution of the longwall in Seam L7, ensuring efficiency and stability for G9 surface works.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
东侧L7煤层长壁合理开采方案,保证蒙都煤矿G9露天工程的稳定
在开采需要保护的地表工程下方的工作面时,可能会产生潜在的危险,对地表工程的稳定造成不安全和影响。对地表工程的影响程度取决于许多因素,包括开采技术因素。研究和评价开采对地表工程的影响,提出相应的技术解决方案和开采工艺,确保开采过程中的安全是十分必要的。通过对Mong Duong煤矿东侧L7煤层长壁的现场研究,找到合理的开采方案对保证G9地面工程的稳定具有重要意义。这些工程包括一个煤仓和一些四级房屋的建筑工程,以及运煤设备和机械,总重量估计在20万吨左右。研究方法包括数值模拟法与对比数据分析法相结合。确定了与长壁工作面推进相对应的塌陷带和破裂带高度及其对地表工程的影响程度。为长壁条件下选择合理的采矿方案,保证地表工程的稳定提供依据。将上述方法应用于Mong Duong煤矿东侧L7煤层长壁情况,得出L7煤层长壁合理开采高度为2.2 m,顶煤回收率为100%(对应0.8 m),当长壁沿走向方向开采至140 m时,G9地面工程不受影响。当长壁向160m方向开采时,这些工程将受到影响。本文的研究结果为勐阳煤矿选择采矿方案和及时调整L7煤层长壁采矿方案提供了依据,保证了G9露天工程的效率和稳定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ESP Application for Oil Production in Naturally Fractured Granitic Basement Reservoir Comparison analytical hierarchy process (AHP) and frequency ratio (FR) method in assessment of landslide susceptibility. A case study in Van Yen district, Yen Bai province Deep geological structure of An Chau trough base on new study data Assessment of liquefaction potential of sand distributed in the 1 District, Ho Chi Minh city Geotechnical zoning in Hai Duong province for construction planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1