{"title":"Study of payment scheduling optimization with generalized precedence relations in the progress payment model","authors":"Nansheng Pang, Y. Zhang, Hui-li Huang","doi":"10.1109/KAM.2010.5646275","DOIUrl":null,"url":null,"abstract":"Based on the consideration of the client and the contractor's joint project profit, a compromise thought that both the client and the contractor deviate from their respective ideal solutions by an equal percentage is proposed, an optimization model of payment scheduling with generalized precedence relations in the progress payment model is constructed. Ultimately, an example is given to demonstrate the effectiveness and practicality of the optimal model.","PeriodicalId":160788,"journal":{"name":"2010 Third International Symposium on Knowledge Acquisition and Modeling","volume":"175 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 Third International Symposium on Knowledge Acquisition and Modeling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/KAM.2010.5646275","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Based on the consideration of the client and the contractor's joint project profit, a compromise thought that both the client and the contractor deviate from their respective ideal solutions by an equal percentage is proposed, an optimization model of payment scheduling with generalized precedence relations in the progress payment model is constructed. Ultimately, an example is given to demonstrate the effectiveness and practicality of the optimal model.