Optimal software release time determination with risk constraint

Bo Yang, Huajun Hu, Jun Zhou
{"title":"Optimal software release time determination with risk constraint","authors":"Bo Yang, Huajun Hu, Jun Zhou","doi":"10.1109/RAMS.2008.4925828","DOIUrl":null,"url":null,"abstract":"For a software development project, when to stop testing the software and release it for operation is of great importance as it impacts both the software reliability and the total cost of the project. Software release time determination, therefore, has attracted a lot of research in the past two decades and several new cost models have been developed in the literature recently. In most research on this topic, the approach taken is to minimize the expected total cost (ETC) of the software project, or further consider the software reliability requirement. However, because the actual total cost (ATC) of the software project is a random variable, minimization of the ETC does not guarantee that the ATC will be near this minimum. In fact, there exists certain risk that the ATC may exceed the ETC to an intolerable extent, which, despite its importance, has not been addressed in most related research. In this paper, we study the above mentioned risk problem for software release time determination and propose a new approach which could be helpful for management to control the risk of the project being over-budget. A numerical example is given to illustrate the solution procedures of the proposed approach.","PeriodicalId":143940,"journal":{"name":"2008 Annual Reliability and Maintainability Symposium","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2008-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Annual Reliability and Maintainability Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2008.4925828","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

For a software development project, when to stop testing the software and release it for operation is of great importance as it impacts both the software reliability and the total cost of the project. Software release time determination, therefore, has attracted a lot of research in the past two decades and several new cost models have been developed in the literature recently. In most research on this topic, the approach taken is to minimize the expected total cost (ETC) of the software project, or further consider the software reliability requirement. However, because the actual total cost (ATC) of the software project is a random variable, minimization of the ETC does not guarantee that the ATC will be near this minimum. In fact, there exists certain risk that the ATC may exceed the ETC to an intolerable extent, which, despite its importance, has not been addressed in most related research. In this paper, we study the above mentioned risk problem for software release time determination and propose a new approach which could be helpful for management to control the risk of the project being over-budget. A numerical example is given to illustrate the solution procedures of the proposed approach.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
风险约束下最优软件发布时间的确定
对于一个软件开发项目来说,何时停止测试软件并发布它进行操作是非常重要的,因为它既影响软件的可靠性,也影响项目的总成本。因此,软件发布时间的确定在过去二十年中吸引了大量的研究,最近在文献中开发了几个新的成本模型。在大多数关于这个主题的研究中,所采取的方法是最小化软件项目的预期总成本(ETC),或者进一步考虑软件可靠性需求。然而,由于软件项目的实际总成本(ATC)是一个随机变量,ETC的最小化并不能保证ATC将接近这个最小值。事实上,ATC存在一定的风险,可能会超过ETC到无法忍受的程度,尽管这一点很重要,但在大多数相关研究中并没有得到解决。本文对软件发布时间确定中的上述风险问题进行了研究,并提出了一种新的方法来帮助管理层控制项目的超支风险。最后给出了一个数值算例来说明该方法的求解过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
What's wrong with bent pin analysis, and what to do about it A systems reliability approach to decision making in autonomous multi-platform systems operating a phased mission Software tools for PRA Optimal highway maintenance policies under uncertainty Reliability analysis of phased-mission systems using Bayesian networks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1