Impact of Institutional Environmental Factors on Project Performance- An Analysis on the Construction Projects in Lahore, Pakistan

Syeda Mehreen Kazmi, Aleena Shuja, S. H. Bukhari
{"title":"Impact of Institutional Environmental Factors on Project Performance- An Analysis on the Construction Projects in Lahore, Pakistan","authors":"Syeda Mehreen Kazmi, Aleena Shuja, S. H. Bukhari","doi":"10.31384/jisrmsse/2021.19.2.2","DOIUrl":null,"url":null,"abstract":"The construction industry has experienced a dramatic boom in the economy over the last two years, due to the significance of CPEC in Pakistan. In the project’s performance, the role and concept of Institutional Environment have been extensively studied in previous literature. However, the analysis of these strategic constructs in construction firms has been minimal. Still, a gap exists in institutional factors concerning project performance. This paper aims to address this gap posits that Institutional Environmental Factors (IEFs) may impact the performance of the construction projects; also, there may be some factors that can impede or promote the performance of these projects. Data were collected from a sample of some construction firms’ management teams through semi-structured interviews. Study results suggested that coercive & normative factors of the institutional environment have a significant impact on the project performance concerning time delays and cost escalation. However, mimetic factors have less impact. This study also tries to assimilate the importance of institutional factors with the policy-making aspects of construction firms which can affect the performance of the projects. Future implications and limitations of the study are also discussed.","PeriodicalId":375599,"journal":{"name":"Journal of Independent Studies and Research-Management, Social Sciences and Economics","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Independent Studies and Research-Management, Social Sciences and Economics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31384/jisrmsse/2021.19.2.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction industry has experienced a dramatic boom in the economy over the last two years, due to the significance of CPEC in Pakistan. In the project’s performance, the role and concept of Institutional Environment have been extensively studied in previous literature. However, the analysis of these strategic constructs in construction firms has been minimal. Still, a gap exists in institutional factors concerning project performance. This paper aims to address this gap posits that Institutional Environmental Factors (IEFs) may impact the performance of the construction projects; also, there may be some factors that can impede or promote the performance of these projects. Data were collected from a sample of some construction firms’ management teams through semi-structured interviews. Study results suggested that coercive & normative factors of the institutional environment have a significant impact on the project performance concerning time delays and cost escalation. However, mimetic factors have less impact. This study also tries to assimilate the importance of institutional factors with the policy-making aspects of construction firms which can affect the performance of the projects. Future implications and limitations of the study are also discussed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
制度环境因素对项目绩效的影响——以巴基斯坦拉合尔建设项目为例
由于中巴经济走廊在巴基斯坦的重要性,建筑业在过去两年中经历了巨大的经济繁荣。在项目绩效中,制度环境的作用和概念在以往的文献中得到了广泛的研究。然而,对建筑公司这些战略结构的分析却很少。但是,影响项目绩效的制度因素还存在差距。本文旨在弥补这一缺口,认为制度环境因素可能影响建设项目绩效;此外,可能有一些因素会阻碍或促进这些项目的绩效。通过半结构化访谈,从一些建筑公司的管理团队中收集数据。研究结果表明,制度环境的强制性和规范性因素对项目绩效有显著影响,包括时间延迟和成本上升。然而,模仿因素的影响较小。本研究还试图将制度因素的重要性与建筑公司决策方面的影响项目绩效的因素结合起来。本文还讨论了未来研究的意义和局限性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Organizational Citizenship Behaviour (OCB) In Educational Settings: A Narrative Review Modeling and Forecasting Stock Market Volatility of CPEC Founding Countries: Using Nonlinear Time Series and Machine Learning Models Corporate Social Responsibility and Firm Financial Performance: Moderating role of Ethical Leadership and Social Capital Performance Management of Strategic Sourcing Process: A Case of the Footwear Industry Walking with the spectrum: A phenomenological study on the experiences of mothers raising an Autistic child
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1