Study on Nuclear Power Program in Indonesia: Status Updates of Problems and Challenges

K. Huda
{"title":"Study on Nuclear Power Program in Indonesia: Status Updates of Problems and Challenges","authors":"K. Huda","doi":"10.9734/bpi/naer/v4/2773f","DOIUrl":null,"url":null,"abstract":"Although the nuclear accident, which occurred in Fukushima Daiichi NPP in 2011, is still fresh in our memory and leaved trauma to a part of the globe inhabitants, many countries have already resumed their nuclear power programs. This is because NPP for some countries has important and strategic roles in meeting electricity demand, as well as, in raising the country’s bargaining position. Beside 16 countries that are currently constructing nuclear power plants, there are about 50 emerging countries, including 30 countries considering, planning and starting nuclear power program, and other 20 remaining countries having an interest at some points in nuclear power plant. They certainly have a different level of success in the program implementation and of complexity in problem, as well. Some countries could run their nuclear program smoothly because they have enough resources and supports from stakeholders, but some others could not. Indonesia is one of countries who battles with their problems and challenges in implementing their nuclear program. Current study is aimed to analyze the problems and challenges encountered by Indonesia in dealing with its nuclear power program, and to find out lessons that can be learned. This paper thus provides the analysis’s results and updates the status of the problems and challenges faced by Indonesia, that might be beneficial to others with similar problems as lessons to learn.","PeriodicalId":251465,"journal":{"name":"New Approaches in Engineering Research Vol. 4","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"New Approaches in Engineering Research Vol. 4","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9734/bpi/naer/v4/2773f","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Although the nuclear accident, which occurred in Fukushima Daiichi NPP in 2011, is still fresh in our memory and leaved trauma to a part of the globe inhabitants, many countries have already resumed their nuclear power programs. This is because NPP for some countries has important and strategic roles in meeting electricity demand, as well as, in raising the country’s bargaining position. Beside 16 countries that are currently constructing nuclear power plants, there are about 50 emerging countries, including 30 countries considering, planning and starting nuclear power program, and other 20 remaining countries having an interest at some points in nuclear power plant. They certainly have a different level of success in the program implementation and of complexity in problem, as well. Some countries could run their nuclear program smoothly because they have enough resources and supports from stakeholders, but some others could not. Indonesia is one of countries who battles with their problems and challenges in implementing their nuclear program. Current study is aimed to analyze the problems and challenges encountered by Indonesia in dealing with its nuclear power program, and to find out lessons that can be learned. This paper thus provides the analysis’s results and updates the status of the problems and challenges faced by Indonesia, that might be beneficial to others with similar problems as lessons to learn.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
印尼核电项目研究:现状、问题与挑战
虽然2011年发生在福岛第一核电站的核事故仍然记忆犹新,给全球一部分居民留下了创伤,但许多国家已经恢复了核电计划。这是因为对一些国家来说,核电厂在满足电力需求以及提高国家议价地位方面具有重要的战略作用。除了目前正在建设核电站的16个国家外,还有大约50个新兴国家,其中有30个国家正在考虑、规划和启动核电项目,其余20个国家在某些方面对核电感兴趣。当然,他们在项目实施和问题复杂性方面的成功程度也有所不同。一些国家可以顺利地运行他们的核项目,因为他们有足够的资源和利益相关者的支持,但其他一些国家不能。印度尼西亚是在实施其核项目方面与问题和挑战作斗争的国家之一。目前的研究旨在分析印度尼西亚在处理其核电计划时遇到的问题和挑战,并找出可以吸取的教训。因此,本文提供了分析的结果,并更新了印度尼西亚面临的问题和挑战的现状,这可能有助于其他有类似问题的国家吸取教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of Contact Pressure on the Road Pavement Created by Modern Vehicles Water Vapor Sensors Based on the Swelling of Relief Gelatin Gratings: Recent Advances and Development Investigating the Effect of Rotor Angle to Characteristic Amplitudo Vibration Shaft on Wind Turbine Horizontal Axis Testing Effect of Bulb-outs at Intersections on Speed Reduction and Visibility Conditions in Tempo–30 Zone Solar Powered Autonomous Vehicle for Seed Sowing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1