{"title":"Enforcing Coasian Bribes for Non-Price Benefits: A New Role for Restitution","authors":"W. J. Gordon, Tamar Frankel","doi":"10.4324/9781003073321-15","DOIUrl":null,"url":null,"abstract":"In Boomer v. Muir, a subcontractor on a hydroelectric project continued to provide goods and services even though the value of the performance far exceeded the contract price. The general contractor, who was receiving these goods and services, breached the contract even though he was paying less than market price for them.<br><br>Please see the complete abstract in the article.","PeriodicalId":404809,"journal":{"name":"LSN: Rights & Remedies (Private Law - Contracts) (Topic)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"LSN: Rights & Remedies (Private Law - Contracts) (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9781003073321-15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In Boomer v. Muir, a subcontractor on a hydroelectric project continued to provide goods and services even though the value of the performance far exceeded the contract price. The general contractor, who was receiving these goods and services, breached the contract even though he was paying less than market price for them.