{"title":"Analysis of Price Adjustment Payments for RCC T-Beam and Pre-stressed Bridges Construction Contracts","authors":"N. Chaudhary, Ajay K. Mishra, P. Aithal","doi":"10.47992/ijcsbe.2581.6942.0250","DOIUrl":null,"url":null,"abstract":"Purpose: Let’s compare and analyze the price adjustment payments for RCC T-beam and Pre-stressed bridges construction contracts for evaluation of the cost effectiveness of price adjustment payment.\nDesign/Methodology/Approach: Based on Questionnaire survey and Official documents, comparison and analysis were done for RCC T-beam and Pre-stressed bridges construction contracts of price adjustment payment.\nFindings/Result: The weightage of price adjustment payment is 9% of total payment. This assessment was done to show the importance of price adjustment and its study in bridge construction contracts. As per GCC & SCC clause 53.7 of Standard Bidding Document, price adjustment is limited to 25%. Comparison of payments for price adjustments was done for different T-girder and pre-stressed bridges. Price adjustment payments for the computed price adjustment coefficients were calculated and compared with that of the actual payment made. \nOriginality/Value: This research was mainly dedicated to deriving logical price adjustment coefficient ranges in making the price adjustment process for RCC T-girder and prestressed construction contracts economical. \nPaper Type: Research paper","PeriodicalId":350972,"journal":{"name":"International Journal of Case Studies in Business, IT, and Education","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Case Studies in Business, IT, and Education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47992/ijcsbe.2581.6942.0250","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose: Let’s compare and analyze the price adjustment payments for RCC T-beam and Pre-stressed bridges construction contracts for evaluation of the cost effectiveness of price adjustment payment.
Design/Methodology/Approach: Based on Questionnaire survey and Official documents, comparison and analysis were done for RCC T-beam and Pre-stressed bridges construction contracts of price adjustment payment.
Findings/Result: The weightage of price adjustment payment is 9% of total payment. This assessment was done to show the importance of price adjustment and its study in bridge construction contracts. As per GCC & SCC clause 53.7 of Standard Bidding Document, price adjustment is limited to 25%. Comparison of payments for price adjustments was done for different T-girder and pre-stressed bridges. Price adjustment payments for the computed price adjustment coefficients were calculated and compared with that of the actual payment made.
Originality/Value: This research was mainly dedicated to deriving logical price adjustment coefficient ranges in making the price adjustment process for RCC T-girder and prestressed construction contracts economical.
Paper Type: Research paper