Feasibility study of industrial projects: A fuzzy AHP approach

Masoud Rahiminezhad Galankashi, Maryam Moffarahi, M. Hisjam, S. A. Helmi
{"title":"Feasibility study of industrial projects: A fuzzy AHP approach","authors":"Masoud Rahiminezhad Galankashi, Maryam Moffarahi, M. Hisjam, S. A. Helmi","doi":"10.1109/ICIMECE.2016.7910430","DOIUrl":null,"url":null,"abstract":"The main objective of this research is to develop a Fuzzy Analytic Hierarchy Process (FAHP) for the aim of conducting feasibility study in the electrical industries. Regardless of the numerous quantity of researches on feasibility study and related techniques, proposing an integrated approach to combine and unify critical factors of feasibility with analytic approaches is less investigated. To fill this gap, this study was conducted to develop a framework to evaluate the feasibility of industrial project aligned with addressing a FAHP to assist managers for selecting the best alternative. Particularly, 6 key indicators proper for feasibility study of industrial projects were proposed using literature survey. The validity of proposed indicators was accredited using a Nominal Group Technology (NGT). The proposed indicators were used to assist an investment company to evaluate three projects. Finally, a FAHP were used to choose the best choice with the aim of proposed indicators. Therefore, the ranking of industrial projects is the main result of this study.","PeriodicalId":143505,"journal":{"name":"2016 2nd International Conference of Industrial, Mechanical, Electrical, and Chemical Engineering (ICIMECE)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 2nd International Conference of Industrial, Mechanical, Electrical, and Chemical Engineering (ICIMECE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIMECE.2016.7910430","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The main objective of this research is to develop a Fuzzy Analytic Hierarchy Process (FAHP) for the aim of conducting feasibility study in the electrical industries. Regardless of the numerous quantity of researches on feasibility study and related techniques, proposing an integrated approach to combine and unify critical factors of feasibility with analytic approaches is less investigated. To fill this gap, this study was conducted to develop a framework to evaluate the feasibility of industrial project aligned with addressing a FAHP to assist managers for selecting the best alternative. Particularly, 6 key indicators proper for feasibility study of industrial projects were proposed using literature survey. The validity of proposed indicators was accredited using a Nominal Group Technology (NGT). The proposed indicators were used to assist an investment company to evaluate three projects. Finally, a FAHP were used to choose the best choice with the aim of proposed indicators. Therefore, the ranking of industrial projects is the main result of this study.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
工业项目可行性研究:一种模糊层次分析法
本研究的主要目的是发展一种模糊层次分析法(FAHP),以进行电力工业的可行性研究。尽管关于可行性研究和相关技术的研究数量众多,但提出一种将可行性关键因素与分析方法相结合和统一的综合方法的研究较少。为了填补这一空白,本研究旨在开发一个框架来评估工业项目的可行性,并解决FAHP问题,以帮助管理者选择最佳方案。通过文献调查,提出了适合工业项目可行性研究的6项关键指标。提出的指标的有效性是通过名义组技术(NGT)来认证的。提出的指标被用于协助一家投资公司评估三个项目。最后,使用FAHP来选择最佳选择,目的是提出指标。因此,工业项目的排名是本研究的主要结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Designing framework for standardization and testing requirements for the secondary battery a case study of lithium-ion battery module in electric vehicle application Electric field optimization on 150 kV GIS spacer using functionally gradient material The evaluation of criteria and subcriteria of research project selection using fuzzy analytical hierarchy process method A closed-loop supply chain model for supplier-manufacturer-retailer system with rework and waste disposal X-band antenna design for Indonesian ground surveillance man pack radar
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1