{"title":"Solving scheduling problems in distribution centers using symmetry breaking constraints","authors":"M. P. Fanti, G. Stecco, W. Ukovich","doi":"10.1109/CASE.2011.6042498","DOIUrl":null,"url":null,"abstract":"This paper deals with the problem of scheduling the internal operations in Distribution Centers (DC). Internal operations of the DC consist essentially in de-consolidating inbound cases, sorting products according to customer requests and consolidating outbound cases. The objective is to minimize the total operation time determining the optimal sequence of the internal operations.","PeriodicalId":236208,"journal":{"name":"2011 IEEE International Conference on Automation Science and Engineering","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE International Conference on Automation Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CASE.2011.6042498","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper deals with the problem of scheduling the internal operations in Distribution Centers (DC). Internal operations of the DC consist essentially in de-consolidating inbound cases, sorting products according to customer requests and consolidating outbound cases. The objective is to minimize the total operation time determining the optimal sequence of the internal operations.