Challenges with use of risk matrices for geohazard risk management for resource development projects

M. Porter, M. Lato, P. Quinn, J. Whittall
{"title":"Challenges with use of risk matrices for geohazard risk management for resource development projects","authors":"M. Porter, M. Lato, P. Quinn, J. Whittall","doi":"10.36487/ACG_REP/1905_01_PORTER","DOIUrl":null,"url":null,"abstract":"Geohazards comprise a subgroup of natural hazards associated with geotechnical, hydrotechnical, tectonic, snow and ice, and geochemical processes that can pose a threat to worker and public safety, asset integrity, and asset management lifecycle cost. Like for most types of threats, the risks from geohazards can be assessed qualitatively or quantitatively and used to inform a geohazard management program. \nMost mining companies use risk matrices to aid in the assessment, prioritisation, communication and management of corporate risks. These matrices use standardised descriptions of likelihood and consequence to help users assess risks of negative outcomes to health, safety, the environment, assets, and reputation, and are tailored to each organisation’s types of risk exposure and level of risk tolerance. \nGeohazards and related geotechnical failures can represent low-probability, high-consequence events that plot in the highest risk zones of most corporate risk matrices. Variability in spatial and temporal probabilities for people and infrastructure exposed to geohazards can have a large influence on risk exposure, and this can be challenging to assess and communicate effectively with some risk matrices. Risk is scale-dependent: the business risk due to rockfall from a single slope along a mine access road is vastly different than the total risk due to rockfalls from all slopes along that road, yet guidance is often missing on how the risks from these scenarios should be plotted on a risk matrix. These and other pitfalls associated with use of corporate risk matrices for informed geohazard management are explored.","PeriodicalId":337751,"journal":{"name":"Proceedings of the First International Conference on Mining Geomechanical Risk","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the First International Conference on Mining Geomechanical Risk","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36487/ACG_REP/1905_01_PORTER","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Geohazards comprise a subgroup of natural hazards associated with geotechnical, hydrotechnical, tectonic, snow and ice, and geochemical processes that can pose a threat to worker and public safety, asset integrity, and asset management lifecycle cost. Like for most types of threats, the risks from geohazards can be assessed qualitatively or quantitatively and used to inform a geohazard management program. Most mining companies use risk matrices to aid in the assessment, prioritisation, communication and management of corporate risks. These matrices use standardised descriptions of likelihood and consequence to help users assess risks of negative outcomes to health, safety, the environment, assets, and reputation, and are tailored to each organisation’s types of risk exposure and level of risk tolerance. Geohazards and related geotechnical failures can represent low-probability, high-consequence events that plot in the highest risk zones of most corporate risk matrices. Variability in spatial and temporal probabilities for people and infrastructure exposed to geohazards can have a large influence on risk exposure, and this can be challenging to assess and communicate effectively with some risk matrices. Risk is scale-dependent: the business risk due to rockfall from a single slope along a mine access road is vastly different than the total risk due to rockfalls from all slopes along that road, yet guidance is often missing on how the risks from these scenarios should be plotted on a risk matrix. These and other pitfalls associated with use of corporate risk matrices for informed geohazard management are explored.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在资源开发项目中使用风险矩阵进行地质灾害风险管理的挑战
地质灾害包括与岩土、水文、构造、冰雪和地球化学过程相关的自然灾害的一个子类,这些自然灾害可能对工人和公共安全、资产完整性和资产管理生命周期成本构成威胁。与大多数类型的威胁一样,地质灾害的风险可以进行定性或定量评估,并用于地质灾害管理计划。大多数矿业公司使用风险矩阵来帮助评估、确定优先次序、沟通和管理公司风险。这些矩阵使用可能性和后果的标准化描述来帮助用户评估对健康、安全、环境、资产和声誉造成负面影响的风险,并根据每个组织的风险暴露类型和风险承受水平进行定制。地质灾害和相关的岩土工程失效可以代表低概率、高后果的事件,这些事件在大多数公司风险矩阵的最高风险区域中绘制。面临地质灾害的人员和基础设施的时空概率变化可能对风险敞口产生很大影响,这可能对评估和与一些风险矩阵进行有效沟通具有挑战性。风险是有规模依赖性的:矿山道路上单个斜坡的岩崩造成的商业风险与该道路上所有斜坡的岩崩造成的总风险大不相同,然而,关于如何在风险矩阵上绘制这些情景的风险,通常缺乏指导。这些和其他与使用公司风险矩阵进行知情地质灾害管理有关的陷阱进行了探讨。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Geotechnical risk-informed decision-making in mining Using qualitative risk assessment as a leading indicator for geotechnical risk in mining Construction of a damage risk model for footwall drifts Quantifying uncertainty in mining geomechanics design Development of the Mine Geotechnical Risk Index
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1