An Arithmetical Approach for Ranking of Factors Impacting the Timeline of Railway Project Using Relative Importance Index Method (RII), and Important Index (IMPI)
{"title":"An Arithmetical Approach for Ranking of Factors Impacting the Timeline of Railway Project Using Relative Importance Index Method (RII), and Important Index (IMPI)","authors":"","doi":"10.37896/sr8.7/016","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":422413,"journal":{"name":"Strad Research","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Strad Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37896/sr8.7/016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}