Cygnus performance on five Subcritical Experiments

J. Smith, E. Ormond, K. Hogge
{"title":"Cygnus performance on five Subcritical Experiments","authors":"J. Smith, E. Ormond, K. Hogge","doi":"10.1109/PPC.2017.8291174","DOIUrl":null,"url":null,"abstract":"The Cygnus Dual Beam Radiographic Facility includes two identical radiographic sources — Cygnus 1 and Cygnus 2. Cygnus is the radiography source used in Subcritical Experiments (SCEs) at the Nevada National Security Site (NNSS). The machine specifications are: Electric 2.25 MV, 60 kA, 60 ns; Radiation 4 Rad, 1 mm, 50 ns; Operation single shot, 2-shots/day. Cygnus has operated at the NNSS since February 2004. In this period, it has participated on five SCE experiments — Armando, Bacchus, Barolo A, Barolo B, and Pollux. SCE projects typically require over a hundred preparatory shots culminating in a single high-fidelity or SCE shot, and typically take over a year for completion. Therefore, SCE shots are high risk and high value making reliability and reproducibility utmost priority. In this regard, major effort is focused on operational performance. A quantitative performance measurement is valuable for tracking and maintaining Cygnus preparedness. In this work, we present a new model for analysis of Cygnus performance. This model uses x-ray dose distribution as the basis for calculation of reliability, record, and reproducibility. It will be applied both to longterm (historical) and short-term (readiness) periods for each of the five SCEs.","PeriodicalId":247019,"journal":{"name":"2017 IEEE 21st International Conference on Pulsed Power (PPC)","volume":"14 7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 21st International Conference on Pulsed Power (PPC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPC.2017.8291174","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Cygnus Dual Beam Radiographic Facility includes two identical radiographic sources — Cygnus 1 and Cygnus 2. Cygnus is the radiography source used in Subcritical Experiments (SCEs) at the Nevada National Security Site (NNSS). The machine specifications are: Electric 2.25 MV, 60 kA, 60 ns; Radiation 4 Rad, 1 mm, 50 ns; Operation single shot, 2-shots/day. Cygnus has operated at the NNSS since February 2004. In this period, it has participated on five SCE experiments — Armando, Bacchus, Barolo A, Barolo B, and Pollux. SCE projects typically require over a hundred preparatory shots culminating in a single high-fidelity or SCE shot, and typically take over a year for completion. Therefore, SCE shots are high risk and high value making reliability and reproducibility utmost priority. In this regard, major effort is focused on operational performance. A quantitative performance measurement is valuable for tracking and maintaining Cygnus preparedness. In this work, we present a new model for analysis of Cygnus performance. This model uses x-ray dose distribution as the basis for calculation of reliability, record, and reproducibility. It will be applied both to longterm (historical) and short-term (readiness) periods for each of the five SCEs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
天鹅座在五个亚临界实验中的表现
天鹅座双光束射线照相设备包括两个相同的射线照相源-天鹅座1和天鹅座2。天鹅座是内华达州国家安全基地(NNSS)亚临界实验(SCEs)中使用的射线照相源。整机规格为:电动2.25 MV、60 kA、60 ns;辐射4 Rad, 1 mm, 50 ns;操作单针,2针/天。天鹅座从2004年2月开始在NNSS运行。在此期间,它参与了五个SCE实验- Armando, Bacchus, Barolo A, Barolo B和Pollux。SCE项目通常需要超过100个准备镜头,最终以一个高保真或SCE镜头结束,通常需要一年多的时间才能完成。因此,SCE拍摄是高风险和高价值的,可靠性和可重复性是最重要的。在这方面,主要的努力集中在业务绩效上。定量的性能测量对于跟踪和维护Cygnus准备是有价值的。在这项工作中,我们提出了一个新的模型来分析Cygnus的性能。该模型使用x射线剂量分布作为计算可靠性、记录性和再现性的基础。它将同时适用于5个企业管理系统的长期(历史)和短期(准备就绪)阶段。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pre-determination of partial discharge inception voltage in power cables using electrode gaps in air under AC voltage Modeling Marx generators for maximum pulse repetition rate estimation Triggering strategy of railgun power supply for the accurate control of the armature muzzle velocity Time-resolved measurements of Cygnus x-ray production using Aerogel Cherenkov Detector Analysis of nonlinear gyromagnetic line operation using LLG equation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1