ANALISA STRUKTUR PELIMPAH BENDUNGAN LUBUK AMBACANG KECAMATAN HULU KUANTAN KABUPATEN KUANTAN SINGINGI PROVINSI RIAU

Nur Sholawatini, Evi Nur Cahya, Heri Suprijanto
{"title":"ANALISA STRUKTUR PELIMPAH BENDUNGAN LUBUK AMBACANG KECAMATAN HULU KUANTAN KABUPATEN KUANTAN SINGINGI PROVINSI RIAU","authors":"Nur Sholawatini, Evi Nur Cahya, Heri Suprijanto","doi":"10.21776/ub.pengairan.2019.010.02.06","DOIUrl":null,"url":null,"abstract":"Lubuk Ambacang Dam is Roller Compact Concrete Dams and located on the Indragiri River, where the overflow spillway structure also important part of the dam. The purpose of this study is to find out the critical area in the structure when an earthquake occurs. Hydraulic analysis determine the appropriate spillway width. Stability analysis is find out that the planned structure is safe from overturning and sliding. The bearing capacity of the soil is also analyzed to determine whether the soil structure has sufficient capacity to withstand the structure load. Structure load are analyzed in normal conditions, Operating Basic Earthquake (OBE) and Maximum Design Earthquake (MDE). Planned of spillway structure based on the analysis of shell plates using STAADPro V8i application. Result of this study, spillway width is 51 meters which is safe from overturning and sliding. Bearing capacity of the soil is able to withstand the structure stress. The results of STAAD.Pro V8i show that the spillway critical area occurs in the upstream part of spillway when the reservoir water conditions are normal and when the OBE occurs. Whereas the Probable Maximum Flood (PMF) condition, critical area is in chuteway channel. For the stilling basin, the critical area occurs in the upper structure when the conditions are Q100th, 1.25Q100th normal and during an OBE.","PeriodicalId":236511,"journal":{"name":"Jurnal Teknik Pengairan","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Pengairan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.pengairan.2019.010.02.06","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Lubuk Ambacang Dam is Roller Compact Concrete Dams and located on the Indragiri River, where the overflow spillway structure also important part of the dam. The purpose of this study is to find out the critical area in the structure when an earthquake occurs. Hydraulic analysis determine the appropriate spillway width. Stability analysis is find out that the planned structure is safe from overturning and sliding. The bearing capacity of the soil is also analyzed to determine whether the soil structure has sufficient capacity to withstand the structure load. Structure load are analyzed in normal conditions, Operating Basic Earthquake (OBE) and Maximum Design Earthquake (MDE). Planned of spillway structure based on the analysis of shell plates using STAADPro V8i application. Result of this study, spillway width is 51 meters which is safe from overturning and sliding. Bearing capacity of the soil is able to withstand the structure stress. The results of STAAD.Pro V8i show that the spillway critical area occurs in the upstream part of spillway when the reservoir water conditions are normal and when the OBE occurs. Whereas the Probable Maximum Flood (PMF) condition, critical area is in chuteway channel. For the stilling basin, the critical area occurs in the upper structure when the conditions are Q100th, 1.25Q100th normal and during an OBE.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Lubuk Ambacang大坝为碾压混凝土坝,位于因德拉吉里河上,其中溢流溢洪道结构也是大坝的重要组成部分。本研究的目的是找出地震发生时结构中的临界区域。水力分析确定合适的溢洪道宽度。稳定性分析表明,所设计的结构具有抗倾覆和抗滑动的能力。还分析了土的承载力,以确定土结构是否具有足够的承受结构荷载的能力。分析了结构在正常工况、运行基本地震(OBE)和最大设计地震(MDE)下的荷载。利用STAADPro V8i软件对基于壳板分析的溢洪道结构进行规划。研究结果表明,溢洪道宽度为51米,具有抗倾覆、抗滑的安全性能。土的承载能力是能够承受结构应力。STAAD的结果。Pro V8i表明,当水库水条件正常时,溢洪道上游发生溢洪道临界区,溢洪道临界区出现在溢洪道上游。而最大可能洪水(PMF)条件下,关键区域是在溜槽通道内。在q100 %、1.25 q100 %正常条件和出窍时,上部构造出现临界区。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis Prioritas Rehabilitasi Jaringan Irigasi Menggunakan Metode Simple Additive Weighting di Aliran Sungai Jompo Studi Alternatif Pengendalian Banjir Sungai Welang dengan Pendekatan Pemodelan Banjir Aliran 2D Zonasi Tingkat Kerawanan Banjir Bandang dengan Sistem Informasi Geografis di Sub-DAS Kaliputih Kabupaten Jember Evaluasi Pendangkalan Pelabuhan Penyeberangan Bira Sulawesi Selatan Dan Usaha Untuk Menanganinya Efektivitas Penerapan Teknologi Pada IPAL Komunal Ditinjau Dari Parameter BOD, COD, dan TSS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1