{"title":"A risk assessment system for multi-facility organizations","authors":"T.M. Wood, S.G. King, J. Kennon","doi":"10.1109/CCST.2003.1297559","DOIUrl":null,"url":null,"abstract":"We describe a concept for a formalized system of analysis tools intended for use in evaluating risk of terrorist attacks on a facility, based upon a proven vulnerability assessment methodology and traditional approach. It describes a three-phase approach, including: 1) focusing policy, procedures, budgeting, research and development, and further assessment activities on those scenarios, which are most likely to be high-risk scenarios; 2) evaluating facilities across an organization in order to prioritize them for detailed facility evaluations; and 3) conducting a detailed facility assessment.","PeriodicalId":344868,"journal":{"name":"IEEE 37th Annual 2003 International Carnahan Conference onSecurity Technology, 2003. Proceedings.","volume":"392 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE 37th Annual 2003 International Carnahan Conference onSecurity Technology, 2003. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CCST.2003.1297559","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
We describe a concept for a formalized system of analysis tools intended for use in evaluating risk of terrorist attacks on a facility, based upon a proven vulnerability assessment methodology and traditional approach. It describes a three-phase approach, including: 1) focusing policy, procedures, budgeting, research and development, and further assessment activities on those scenarios, which are most likely to be high-risk scenarios; 2) evaluating facilities across an organization in order to prioritize them for detailed facility evaluations; and 3) conducting a detailed facility assessment.