A Unified PSO-based method for multi-hoist scheduling in advanced Galvanic plants

D. Ramin, E. Leo, L. Nicolosi, S. Spinelli, A. Brusaferri
{"title":"A Unified PSO-based method for multi-hoist scheduling in advanced Galvanic plants","authors":"D. Ramin, E. Leo, L. Nicolosi, S. Spinelli, A. Brusaferri","doi":"10.1109/CoDIT49905.2020.9263919","DOIUrl":null,"url":null,"abstract":"In this work, we propose a method based on the unified particle swarm optimization (UPSO) for no-wait multi-hoist scheduling, including a collision avoidance heuristic. Conflicts due to track sharing between hoists and no-wait constraints represent major issues to be addressed. Consequently, a complex optimization problem has to be solved dynamically, to identify the best operating strategy to be executed depending on the characteristics of the current job list. A decomposition procedure has been developed to speed up the solution of the large-scale optimization problem at hand. The proposed approach is demonstrated on a real galvanic process layout, showing the improved performances achieved by the proposed heuristic compared to the monolithic approach.","PeriodicalId":355781,"journal":{"name":"2020 7th International Conference on Control, Decision and Information Technologies (CoDIT)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 7th International Conference on Control, Decision and Information Technologies (CoDIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CoDIT49905.2020.9263919","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

In this work, we propose a method based on the unified particle swarm optimization (UPSO) for no-wait multi-hoist scheduling, including a collision avoidance heuristic. Conflicts due to track sharing between hoists and no-wait constraints represent major issues to be addressed. Consequently, a complex optimization problem has to be solved dynamically, to identify the best operating strategy to be executed depending on the characteristics of the current job list. A decomposition procedure has been developed to speed up the solution of the large-scale optimization problem at hand. The proposed approach is demonstrated on a real galvanic process layout, showing the improved performances achieved by the proposed heuristic compared to the monolithic approach.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于pso的先进电厂多提升机统一调度方法
本文提出了一种基于统一粒子群优化(UPSO)的多提升机无等待调度方法,并引入了避碰启发式算法。由于起重机之间的轨道共享和无等待约束导致的冲突是需要解决的主要问题。因此,必须动态地解决复杂的优化问题,以根据当前作业列表的特征确定要执行的最佳操作策略。为了加速求解手头的大规模优化问题,开发了一种分解程序。该方法在实际的电偶工艺布局中得到了验证,与单片方法相比,该方法的性能得到了改善。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Trajectory tracking controller for nonlinear systems with disturbances using iterative learning algorithm without resetting condition Influence of a water flow variation on the efficiency of a hybrid PV/T water panel Demand-Oriented Rescheduling of Railway Traffic in Case of Delays Synergetic Synthesis of Adaptive Control of an Electro-pneumatic System Tourist Behaviour Analysis Based on Digital Pattern of Life
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1