{"title":"Simultaneous Operation Scheduling and Operation Delay Selection to Minimize Cycle-by-Cycle Power Differential","authors":"W. Yen, Shih-Hsu Huang, Chun-Hua Cheng","doi":"10.1007/978-3-540-77090-9_59","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":267903,"journal":{"name":"EUC Workshops","volume":"295 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"EUC Workshops","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-540-77090-9_59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1