Impact of sub-hourly bidding in power exchanges in India

S. Barpanda, S. C. Saxena, K. Dey, K. V. N. Pawan Kumar
{"title":"Impact of sub-hourly bidding in power exchanges in India","authors":"S. Barpanda, S. C. Saxena, K. Dey, K. V. N. Pawan Kumar","doi":"10.1109/ENERGYECONOMICS.2015.7235075","DOIUrl":null,"url":null,"abstract":"Multiple Power Exchanges were introduced in India in 2008 and began with an hourly bidding structure. This paper details the impact of 15 minute bidding introduced in Power Exchanges in India from April, 2012 on the portfolio management of utilities. A literature survey of international practices has also been carried out. It is observed that the 15 minute bidding has modified the scheduling pattern, ramping behaviour, portfolio management of state utilities, price discovery and helped in integration of renewable energy in the Indian Electricity Market.","PeriodicalId":130355,"journal":{"name":"2015 International Conference on Energy Economics and Environment (ICEEE)","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Energy Economics and Environment (ICEEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYECONOMICS.2015.7235075","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Multiple Power Exchanges were introduced in India in 2008 and began with an hourly bidding structure. This paper details the impact of 15 minute bidding introduced in Power Exchanges in India from April, 2012 on the portfolio management of utilities. A literature survey of international practices has also been carried out. It is observed that the 15 minute bidding has modified the scheduling pattern, ramping behaviour, portfolio management of state utilities, price discovery and helped in integration of renewable energy in the Indian Electricity Market.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
次小时竞价对印度电力交易所的影响
2008年,印度引入了多个电力交易所,并开始采用小时报价结构。本文详细介绍了2012年4月印度电力交易所引入的15分钟竞价对公用事业投资组合管理的影响。还对国际惯例进行了文献调查。据观察,15分钟竞价改变了调度模式、爬坡行为、国有公用事业的投资组合管理、价格发现,并有助于印度电力市场的可再生能源整合。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Letter of acquisition Smart grid implementation in India — A case study of Puducherry Pilot Project, India One hour ahead load forecast of PJM electricity market & UPPCL Comparative study of optimization algorithms for enhancement of small signal stability by designing PSS for multi-machine power system Aging leader and challenger based PSO for harmonic mitigation using SAPF
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1