Detailed Study on Critical Delay Factors Affecting the Construction Industry

K. Ravisankar, T Bragateeswaran
{"title":"Detailed Study on Critical Delay Factors Affecting the Construction Industry","authors":"K. Ravisankar, T Bragateeswaran","doi":"10.34256/IJCEAE1917","DOIUrl":null,"url":null,"abstract":"The Construction industry of India is an important indicator of the growth as it generates investment opportunities across various related sectors. Delay in construction projects is considered one of the most common problems causing a multitude of negative effects on the construction projects. Construction delays can be defined as the late completion of work compared to the planned schedule or contract schedule. Construction delays can be minimized only when their cause are identified. The objective of this study was to identify the major causes of construction delays. In this context the management of the delay may influence the financial performance of the project, since the overall value of contractual penalties may exceed ten percentage or more than that of the project budget. \nThis study was carried out based on literature review and a questionnaire survey. The data for this study will be gathering through a detailed questionnaire survey. The questionnaire consists of total factors of seventeen group were contributed to the causes of construction delay based on literature review. In that seventeen groups have been consist of total 50 factors for delay. The questionnaire form is forwarded to various construction industries through email and in personal. The objectives of the study were successfully achieved. The top five most important factors that contributed to the causes of delays were Delay in financial support by owner to the contractor (Stage by stage payment), Design errors made by designers due to unfamiliarity with local conditions & environment, Equipment allocation problem, Poor site management & Inaccurate site investigation, Fluctuation of prices. To minimize delay in construction projects it has been identified that the top three effective methods of minimizing construction delays includes: site management and supervision, effective strategic planning, and clear information and communication channels.","PeriodicalId":154319,"journal":{"name":"International Journal of Civil, Environmental and Agricultural Engineering","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Civil, Environmental and Agricultural Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34256/IJCEAE1917","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Construction industry of India is an important indicator of the growth as it generates investment opportunities across various related sectors. Delay in construction projects is considered one of the most common problems causing a multitude of negative effects on the construction projects. Construction delays can be defined as the late completion of work compared to the planned schedule or contract schedule. Construction delays can be minimized only when their cause are identified. The objective of this study was to identify the major causes of construction delays. In this context the management of the delay may influence the financial performance of the project, since the overall value of contractual penalties may exceed ten percentage or more than that of the project budget. This study was carried out based on literature review and a questionnaire survey. The data for this study will be gathering through a detailed questionnaire survey. The questionnaire consists of total factors of seventeen group were contributed to the causes of construction delay based on literature review. In that seventeen groups have been consist of total 50 factors for delay. The questionnaire form is forwarded to various construction industries through email and in personal. The objectives of the study were successfully achieved. The top five most important factors that contributed to the causes of delays were Delay in financial support by owner to the contractor (Stage by stage payment), Design errors made by designers due to unfamiliarity with local conditions & environment, Equipment allocation problem, Poor site management & Inaccurate site investigation, Fluctuation of prices. To minimize delay in construction projects it has been identified that the top three effective methods of minimizing construction delays includes: site management and supervision, effective strategic planning, and clear information and communication channels.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
影响建筑业关键延迟因素的详细研究
印度的建筑业是经济增长的一个重要指标,因为它在各个相关部门产生了投资机会。建设项目的延误被认为是最常见的问题之一,对建设项目造成了许多负面影响。施工延误可以定义为与计划进度或合同进度相比工作的延迟完成。只有找出原因,才能最大限度地减少施工延误。本研究的目的是确定施工延误的主要原因。在这种情况下,对延误的管理可能会影响项目的财务业绩,因为合同罚款的总额可能超过项目预算的10%或更多。本研究采用文献回顾法和问卷调查法。本研究的数据将通过详细的问卷调查收集。在文献回顾的基础上,问卷由17组总因子组成。其中17组由总共50个延迟因素组成。问卷表格会以电邮或私人方式转发给不同的建造业。这项研究的目标成功地实现了。造成工期延误的五个最重要的因素是:业主对承包商的资金支持延迟(分期付款)、设计师因不熟悉当地条件和环境而导致的设计错误、设备配置问题、现场管理不善和现场调查不准确、价格波动。为了最大限度地减少施工项目的延误,已经确定了最大限度地减少施工延误的三个有效方法:现场管理和监督,有效的战略规划,以及明确的信息和沟通渠道。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Trend in Groundwater-Quality Parameters: A Case Study The utilisation of End-of-Life Plastics for the production of paver blocks: A waste management and disposal strategy Hill Women-led Spring Water Management in Darjeeling Himalayan Region, West Bengal Preliminary observation of bacterial biofilm communities on plastic litters and their surface degradation in two coastal areas of Tuticorin, India Quantification and characterisation of microplastic pollution and its ecological risk in the coastline of Tuticorin, India
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1