Costs optimization for unit commitment and economic load dispatch in large scale power systems

Norhamimi, Musse Mohamud Ahmed, I. Hassan
{"title":"Costs optimization for unit commitment and economic load dispatch in large scale power systems","authors":"Norhamimi, Musse Mohamud Ahmed, I. Hassan","doi":"10.1109/PECON.2004.1461641","DOIUrl":null,"url":null,"abstract":"Power generation business profit depends on the power systems operational costs. Finding an optimal solution to the unit commitment (UC) and economic load dispatch (ELD) is one of the smart strategies that being practiced by most of power producers. UC and ELD main problems are to find the minimum total fuel cost and fast computation simulation time scheduling of UC and ELD. Obtaining the best solution to these two problems lead to remarkable saving in the power system operational cost Lagrangian relaxation (LR) is one of the best solution methods to UC and ELD problems. The approach is more efficient and easier than other methods in solving large-scale problems. Lately, the emerging of bundling methods (BM) improves the weakness of LR. Through BM, the LR dual functions are updated at the higher level. With the use of interior point method as an initialization method this paper presents LR and BM based solution technique to UC and ELD problems. It is based on application of the said techniques to thermal units consisting of 45 generators. A comparison has been made with a data taken from Tenaga Nasional Berhad (TNB) and the results found from this system have been compared to that of TNB results.","PeriodicalId":375856,"journal":{"name":"PECon 2004. Proceedings. National Power and Energy Conference, 2004.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2004-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PECon 2004. Proceedings. National Power and Energy Conference, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECON.2004.1461641","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

Power generation business profit depends on the power systems operational costs. Finding an optimal solution to the unit commitment (UC) and economic load dispatch (ELD) is one of the smart strategies that being practiced by most of power producers. UC and ELD main problems are to find the minimum total fuel cost and fast computation simulation time scheduling of UC and ELD. Obtaining the best solution to these two problems lead to remarkable saving in the power system operational cost Lagrangian relaxation (LR) is one of the best solution methods to UC and ELD problems. The approach is more efficient and easier than other methods in solving large-scale problems. Lately, the emerging of bundling methods (BM) improves the weakness of LR. Through BM, the LR dual functions are updated at the higher level. With the use of interior point method as an initialization method this paper presents LR and BM based solution technique to UC and ELD problems. It is based on application of the said techniques to thermal units consisting of 45 generators. A comparison has been made with a data taken from Tenaga Nasional Berhad (TNB) and the results found from this system have been compared to that of TNB results.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
大型电力系统机组投入成本优化与经济负荷调度
发电企业的利润取决于电力系统的运行成本。寻找机组承诺(UC)和经济负荷调度(ELD)的最优解决方案是大多数发电企业正在实践的智能策略之一。UC和ELD的主要问题是寻找最小的总燃料成本和快速计算模拟UC和ELD的时间调度。拉格朗日松弛法(LR)是解决UC和ELD问题的最佳方法之一。在解决大规模问题时,这种方法比其他方法更有效、更容易。近年来,捆绑方法(BM)的出现改善了LR的缺点。通过BM, LR的双重功能在更高层次上得到更新。本文采用内点法作为初始化方法,提出了基于LR和BM的UC和ELD问题求解技术。它是基于上述技术在由45台发电机组成的热机组上的应用。与Tenaga Nasional Berhad (TNB)的数据进行了比较,并将该系统的结果与TNB的结果进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Application of improved genetic algorithms for loss minimisation in power system Implementation of different passive filter designs for harmonic mitigation A new single-phase two-wire hybrid active power filter using extension p-q theorem for photovoltaic application Voltage stability based weak area clustering technique in power system Calculation of static thrust on a linear DC actuator
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1