{"title":"R. & D. project cost and schedule realism-A risk analysis approach","authors":"D. Borgman, J. Hwang","doi":"10.1109/CDC.1975.270600","DOIUrl":null,"url":null,"abstract":"All project managers strive for cost and schedule realism. The Department of the Army has established a novel concept called the \"Total Risk Assessing Cost Estimate (TRACE)\" to develop a new program cost-estimation procedure for research, development, test and evaluation cost realism. Such a procedure properly accommodates program uncertainties/ risks inherent to specific work elements, and the high-risk work elements are budgeted accordingly. The purpose of this paper is to propose such a procedure which subscribes to a risk analysis approach and satisfies the essential elements of the TRACE concept. The procedure consists of two models: a cost impact model and a schedule variance model. Applications of the procedure to the NASA/Army Tilt Rotor Research Aircraft Project are also presented for illustration.","PeriodicalId":164707,"journal":{"name":"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1975-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.1975.270600","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
All project managers strive for cost and schedule realism. The Department of the Army has established a novel concept called the "Total Risk Assessing Cost Estimate (TRACE)" to develop a new program cost-estimation procedure for research, development, test and evaluation cost realism. Such a procedure properly accommodates program uncertainties/ risks inherent to specific work elements, and the high-risk work elements are budgeted accordingly. The purpose of this paper is to propose such a procedure which subscribes to a risk analysis approach and satisfies the essential elements of the TRACE concept. The procedure consists of two models: a cost impact model and a schedule variance model. Applications of the procedure to the NASA/Army Tilt Rotor Research Aircraft Project are also presented for illustration.