An introduction to completing a NERC PRC-019 study for traditional and distributed generation sources

Matthew Manley, Tony Limon
{"title":"An introduction to completing a NERC PRC-019 study for traditional and distributed generation sources","authors":"Matthew Manley, Tony Limon","doi":"10.1109/CPRE.2018.8349773","DOIUrl":null,"url":null,"abstract":"NERC PRC standards have been implemented as a comprehensive plan to increase utility reliability in response to the 2003 Northeast United States blackout. The intent of PRC-019 is to verify regulating controls, limiters, equipment capabilities, and protection controls installed at generation facilities are appropriately coordinated so as to not exacerbate adverse power grid conditions during a system disturbance. PRC-019 provides fairly explicit guidance for what is expected to show compliance for synchronous generator facilities. PRC-019 does not contain explicit guidance on how to show compliance for asynchronous or distributed generation resources. This paper describes the approach, challenges, and lessons learned from performing NERC PRC-019 studies of both typical synchronous and asynchronous generators. Both the commonalities and variances of synchronous and asynchronous generation facilities are highlighted to provide the connecting link between what is explicitly stated in PRC-019 requirements and what is commonly expected by compliance authorities. While the interpretation for what is necessary to demonstrate compliance can vary between reliability coordinators; this paper provides examples of proven compliance documentation for a recent PRC-019 wind farm study.","PeriodicalId":285875,"journal":{"name":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2018.8349773","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

NERC PRC standards have been implemented as a comprehensive plan to increase utility reliability in response to the 2003 Northeast United States blackout. The intent of PRC-019 is to verify regulating controls, limiters, equipment capabilities, and protection controls installed at generation facilities are appropriately coordinated so as to not exacerbate adverse power grid conditions during a system disturbance. PRC-019 provides fairly explicit guidance for what is expected to show compliance for synchronous generator facilities. PRC-019 does not contain explicit guidance on how to show compliance for asynchronous or distributed generation resources. This paper describes the approach, challenges, and lessons learned from performing NERC PRC-019 studies of both typical synchronous and asynchronous generators. Both the commonalities and variances of synchronous and asynchronous generation facilities are highlighted to provide the connecting link between what is explicitly stated in PRC-019 requirements and what is commonly expected by compliance authorities. While the interpretation for what is necessary to demonstrate compliance can vary between reliability coordinators; this paper provides examples of proven compliance documentation for a recent PRC-019 wind farm study.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
介绍如何完成NERC PRC-019研究传统和分布式发电源
为应对2003年美国东北部停电事故,NERC中国标准作为一项提高公用事业可靠性的综合计划得到实施。PRC-019的目的是验证安装在发电设施上的调节控制、限制器、设备能力和保护控制是否得到适当协调,以便在系统扰动期间不会加剧不利的电网状况。PRC-019对同步发电机设施的合规性提供了相当明确的指导。PRC-019不包含关于如何显示异步或分布式生成资源的遵从性的明确指导。本文描述了执行NERC PRC-019研究典型同步和异步发电机的方法、挑战和经验教训。本文强调了同步和异步生成设施的共性和差异,以便在PRC-019要求中明确规定的内容与合规性当局通常期望的内容之间提供连接链接。虽然对于证明合规性的必要性的解释在可靠性协调者之间可能有所不同;本文为最近的PRC-019风电场研究提供了经过验证的合规文件示例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Correlating protective relay reports for system-wide, post-event analysis Back to the basics — Event analysis using symmetrical components Cyber security — Securing the protection and control relay communication in substation Communications assisted islanding detection: Contrasting direct transfer trip and phase comparison methods Applying intelligent fast load shed using IEC 61850 GOOSE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1