Inherent Delay Risk Assessment in Construction: A proactive approach, mitigating the impact of causes of delay on schedule

Qais Amarkhil, E. Elwakil, B. Hubbard
{"title":"Inherent Delay Risk Assessment in Construction: A proactive approach, mitigating the impact of causes of delay on schedule","authors":"Qais Amarkhil, E. Elwakil, B. Hubbard","doi":"10.1109/SusTech51236.2021.9467448","DOIUrl":null,"url":null,"abstract":"Construction project delay leads to significant time & cost overrun and results in revenue loss. Construction projects' complexity and poor planning have negatively impacted the construction industry in adopting new technology, improving productivity, and environmental sustainability. Researcher in the construction profession has extensively studied construction delays in various circumstances. Available literature demonstrates that identifying critical causes of project delay, delay compensability, and project delay claims are broadly studied topics. Few researchers have investigated how to measure and mitigate construction project delay causes proactively before actual construction time. On the other hand, the lack of a standardized delay approach in assessing the impact of critical causes of delays on project performance and the heterogeneity of identified causes of delay have aggravated the situation to comprehend the delay cause impact on a project and its environment. To this end, this study has focused on identifying critical causes of delay in a standardized delay format to measure and mitigate its impact on a project before the actual construction start. This paper has employed a mix-method to quantify the impact of the inherent causes of delay on the project schedule. A five-step framework is applied to achieve the study objective. The proposed approach and technique enable researchers and practitioners to actively measure the impact of inherent delay causes on a project to improve productivity and eliminate redundant processes. This approach is more feasible to be integrated with new technology to assess alternative options for a project schedule to have a tolerable level of sequencing criticality and inherent delay risk.","PeriodicalId":127126,"journal":{"name":"2021 IEEE Conference on Technologies for Sustainability (SusTech)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE Conference on Technologies for Sustainability (SusTech)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SusTech51236.2021.9467448","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Construction project delay leads to significant time & cost overrun and results in revenue loss. Construction projects' complexity and poor planning have negatively impacted the construction industry in adopting new technology, improving productivity, and environmental sustainability. Researcher in the construction profession has extensively studied construction delays in various circumstances. Available literature demonstrates that identifying critical causes of project delay, delay compensability, and project delay claims are broadly studied topics. Few researchers have investigated how to measure and mitigate construction project delay causes proactively before actual construction time. On the other hand, the lack of a standardized delay approach in assessing the impact of critical causes of delays on project performance and the heterogeneity of identified causes of delay have aggravated the situation to comprehend the delay cause impact on a project and its environment. To this end, this study has focused on identifying critical causes of delay in a standardized delay format to measure and mitigate its impact on a project before the actual construction start. This paper has employed a mix-method to quantify the impact of the inherent causes of delay on the project schedule. A five-step framework is applied to achieve the study objective. The proposed approach and technique enable researchers and practitioners to actively measure the impact of inherent delay causes on a project to improve productivity and eliminate redundant processes. This approach is more feasible to be integrated with new technology to assess alternative options for a project schedule to have a tolerable level of sequencing criticality and inherent delay risk.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
施工中的内在延迟风险评估:一种主动的方法,减轻延误原因对进度的影响
建设项目的延误会导致大量的时间和成本超支,并导致收入损失。建筑项目的复杂性和糟糕的规划对建筑行业采用新技术、提高生产率和环境可持续性产生了负面影响。建筑行业的研究人员广泛研究了各种情况下的施工延误。现有文献表明,确定项目延迟的关键原因、延迟可补偿性和项目延迟索赔是广泛研究的主题。如何在实际施工前主动测量和缓解施工项目延误原因的研究很少。另一方面,在评估延迟的关键原因对项目绩效的影响时,缺乏标准化的延迟方法,以及确定的延迟原因的异质性,加剧了理解延迟原因对项目及其环境的影响的情况。为此,本研究的重点是在实际施工开始之前,以标准化的延迟格式确定延迟的关键原因,以衡量和减轻其对项目的影响。本文采用了一种混合方法来量化延迟的内在原因对项目进度的影响。采用五步框架来实现研究目标。所建议的方法和技术使研究人员和实践者能够积极地测量项目中固有延迟导致的影响,以提高生产力并消除冗余过程。这种方法与新技术相结合,评估项目进度表的备选方案,使其具有可容忍的排序临界程度和固有的延迟风险,这是更可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Welcome Message from the Conference Chair Molten Salt Based Nanofluids for Solar Thermal Power Plant: A Case Study Sparking Energy Mindset at Home with the Create a Spark Energy House Challenge High-Endurance UAV Via Parasitic Weight Minimization and Wireless Energy Harvesting AI Legitimacy for Sustainability
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1