Saudi Aramco vision of optimized power system automation (PSA)

M. Abduh, A. B. Hassan, A. Sheikh
{"title":"Saudi Aramco vision of optimized power system automation (PSA)","authors":"M. Abduh, A. B. Hassan, A. Sheikh","doi":"10.1109/SASG.2016.7849689","DOIUrl":null,"url":null,"abstract":"Saudi Aramco electrical control and monitoring system evolved to Power Systems Automation (PSA). The first implementation of PSA was in 2009 following Saudi Aramco Internal Standard 126 imbued with IEC-61850 standard. Since then, search for new automation solution did not stop and the Company's cyber security level of maturity has increased, questing for improved cyber security measures. This document translates the knowledge gained since the implementation of PSA following Standard 126. It describes the current PSA architecture and drives recommendations to enhance the system to what Saudi Aramco envisions of an optimized PSA. Saudi Aramco Optimized PSA calls for increased reliability, rapid deployment, complete segregation between Substation and Control Room, reduced Total Cost of Ownership (TCO) and improved security. It induces Company's transition to the next level of future Substation Automation System.","PeriodicalId":343189,"journal":{"name":"2016 Saudi Arabia Smart Grid (SASG)","volume":"60 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 Saudi Arabia Smart Grid (SASG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SASG.2016.7849689","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Saudi Aramco electrical control and monitoring system evolved to Power Systems Automation (PSA). The first implementation of PSA was in 2009 following Saudi Aramco Internal Standard 126 imbued with IEC-61850 standard. Since then, search for new automation solution did not stop and the Company's cyber security level of maturity has increased, questing for improved cyber security measures. This document translates the knowledge gained since the implementation of PSA following Standard 126. It describes the current PSA architecture and drives recommendations to enhance the system to what Saudi Aramco envisions of an optimized PSA. Saudi Aramco Optimized PSA calls for increased reliability, rapid deployment, complete segregation between Substation and Control Room, reduced Total Cost of Ownership (TCO) and improved security. It induces Company's transition to the next level of future Substation Automation System.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
沙特阿美优化电力系统自动化(PSA)愿景
沙特阿美电气控制和监控系统发展到电力系统自动化(PSA)。PSA的第一次实施是在2009年,根据沙特阿美内部标准126注入了IEC-61850标准。此后,公司不断寻求新的自动化解决方案,网络安全成熟度不断提高,寻求改进的网络安全措施。本文件翻译了自PSA实施以来所获得的知识,遵循标准126。它描述了当前的PSA架构,并提出了改进系统的建议,以满足沙特阿美公司对优化PSA的设想。沙特阿美优化的PSA要求提高可靠性、快速部署、变电站和控制室之间的完全隔离、降低总拥有成本(TCO)并提高安全性。引出了公司向未来变电站自动化系统的下一个阶段的过渡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Table of content This DOI was assigned in error Space vector modulation current control of a three-phase PV grid-connected inverter Reducing the duration of right-of-way acquisition process for high voltage transmission power lines projects Leveraging GIS mapping and smart metering for improved OMS and SAIDI for smart city
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1