Procurement Procedures and Implementation of Kenya Ports Authority Projects, Mombasa County

Douglas Mbula Musyoka, L. Wainaina
{"title":"Procurement Procedures and Implementation of Kenya Ports Authority Projects, Mombasa County","authors":"Douglas Mbula Musyoka, L. Wainaina","doi":"10.35942/ijcab.v7i1.300","DOIUrl":null,"url":null,"abstract":"The Kenya Port Authority aims at aligning its policies and projects to the government’s Big Four development agenda: Food Security, Manufacturing, Universal Healthcare and Affordable Housing. However, most projects have faced key challenges on time and costs management which have led to lack of project completion within the specified time and thus increases the costs involved. The intended benefits are partly or never realized due to many unsuccessful project implementations. The main objective of the research study was to investigate the influence of procurement procedures on the implementation of Kenya Ports Authority Projects, Mombasa County. The specific objectives of the study were to examine the influence of procurement planning, supplier selection, contract monitoring and control and inventory management. The study was guided by grey system theory and lean inventory theory. This study utilized descriptive research design. The unit of observation was the project managers and project team who are directly involved in the implementation of projects undertaken by KPA. Therefore, the targeted respondents were 100 comprising of 15 project managers and 85 project team members. A census of 100 respondents was carried out. Primary data was collected using questionnaires. Piloting of research instruments was carried out within the organization involving 10 respondents who were not involved in the final study. Content validity was employed in this study to determine how well the research instruments will measure what they were designed to measure. Cronbach’s alpha method was used to check for the internal consistency of the items in the questionnaire. Quantitative data was analyzed using descriptive statistics such as mean and standard deviation. In order to test the relationship between variables and the extent to which they are influence each other multiple regression analysis was applied. The study concluded that procurement planning increases efficiency and reduces procurement time which enables procurement arrangements to be more appropriate to the contracts being procured, delivering faster processing of activities and more efficient contract implementation. Supplier selection based on quality factors improves quality project implementation in Kenya Ports Authority. contract monitoring and control ensures that products are delivered as and when they are ordered. Procurement activities are assessed continuously to ensure that contracts are honored, and all purchasing processes have been followed. Effective inventory management allows the organization to fulfill orders on time and accurately. The study recommended that during the procurement process the organization should consider procurement objectives, the savings and benefits opportunities and the measures and targets and the approach to risk management. When selecting suppliers the organization should consider their reliability and quality of suppliers which needs to be consistent. The organization should standardize contract creation using a set of terms, conditions, and legal language that applies to a large subset of contracts. The organization should set minimum stock levels for each item that allows it to order new stock in before it runs out, understand its supply chain and minimize shrinkage.","PeriodicalId":119984,"journal":{"name":"International Journal of Current Aspects","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-02-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Current Aspects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35942/ijcab.v7i1.300","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Kenya Port Authority aims at aligning its policies and projects to the government’s Big Four development agenda: Food Security, Manufacturing, Universal Healthcare and Affordable Housing. However, most projects have faced key challenges on time and costs management which have led to lack of project completion within the specified time and thus increases the costs involved. The intended benefits are partly or never realized due to many unsuccessful project implementations. The main objective of the research study was to investigate the influence of procurement procedures on the implementation of Kenya Ports Authority Projects, Mombasa County. The specific objectives of the study were to examine the influence of procurement planning, supplier selection, contract monitoring and control and inventory management. The study was guided by grey system theory and lean inventory theory. This study utilized descriptive research design. The unit of observation was the project managers and project team who are directly involved in the implementation of projects undertaken by KPA. Therefore, the targeted respondents were 100 comprising of 15 project managers and 85 project team members. A census of 100 respondents was carried out. Primary data was collected using questionnaires. Piloting of research instruments was carried out within the organization involving 10 respondents who were not involved in the final study. Content validity was employed in this study to determine how well the research instruments will measure what they were designed to measure. Cronbach’s alpha method was used to check for the internal consistency of the items in the questionnaire. Quantitative data was analyzed using descriptive statistics such as mean and standard deviation. In order to test the relationship between variables and the extent to which they are influence each other multiple regression analysis was applied. The study concluded that procurement planning increases efficiency and reduces procurement time which enables procurement arrangements to be more appropriate to the contracts being procured, delivering faster processing of activities and more efficient contract implementation. Supplier selection based on quality factors improves quality project implementation in Kenya Ports Authority. contract monitoring and control ensures that products are delivered as and when they are ordered. Procurement activities are assessed continuously to ensure that contracts are honored, and all purchasing processes have been followed. Effective inventory management allows the organization to fulfill orders on time and accurately. The study recommended that during the procurement process the organization should consider procurement objectives, the savings and benefits opportunities and the measures and targets and the approach to risk management. When selecting suppliers the organization should consider their reliability and quality of suppliers which needs to be consistent. The organization should standardize contract creation using a set of terms, conditions, and legal language that applies to a large subset of contracts. The organization should set minimum stock levels for each item that allows it to order new stock in before it runs out, understand its supply chain and minimize shrinkage.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
肯尼亚港口管理局项目的采购程序和实施,蒙巴萨县
肯尼亚港务局的目标是使其政策和项目与政府的四大发展议程保持一致:粮食安全、制造业、全民医疗保健和经济适用房。然而,大多数项目都面临着时间和成本管理的关键挑战,导致项目无法在规定的时间内完成,从而增加了所涉及的成本。由于许多不成功的项目实现,预期的收益部分或从未实现。研究的主要目的是调查采购程序对蒙巴萨县肯尼亚港务局项目实施的影响。这项研究的具体目标是审查采购规划、供应商选择、合同监测和控制以及库存管理的影响。本研究以灰色系统理论和精益库存理论为指导。本研究采用描述性研究设计。观察单位是项目经理和项目小组,他们直接参与实施由KPA承担的项目。因此,目标受访者为100人,包括15名项目经理和85名项目团队成员。对100名受访者进行了普查。主要数据采用问卷调查方式收集。在该组织内部进行了研究工具的试点,涉及10名未参与最后研究的答复者。在本研究中,内容效度被用来确定研究工具将如何很好地测量它们被设计用来测量的东西。采用Cronbach’s alpha法检验问卷各条目的内部一致性。定量数据分析采用描述性统计,如平均值和标准差。为了检验变量之间的关系以及它们相互影响的程度,采用了多元回归分析。这项研究的结论是,采购规划提高了效率,缩短了采购时间,使采购安排更适合所采购的合同,更快地处理各项活动,更有效地执行合同。基于质量因素的供应商选择提高了肯尼亚港务局项目实施的质量。合同监督和控制确保产品按订单交付。采购活动持续评估,以确保合同得到履行,并遵循所有采购流程。有效的库存管理使组织能够及时准确地完成订单。研究报告建议,在采购过程中,组织应考虑采购目标、节省和惠益的机会、措施和指标以及风险管理的方法。在选择供应商时,组织应考虑其可靠性和供应商的质量需要保持一致。组织应该使用一组适用于大部分合同的条款、条件和法律语言来标准化合同的创建。组织应该为每个项目设定最低库存水平,以便在库存耗尽之前订购新库存,了解其供应链并最大限度地减少损耗。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Sustainability Business and Its Impact on Project Performance In the mining Industry in Kenya: A case of Tata Chemicals Magadi, Kenya Project Management Practices and Implementation of Somali Humanitarian Fund Projects by Local Non-Governmental Organizations in Mogadishu, Somalia Physical and Environmental Factors Influencing Accessibility to Sanitation and Hygiene Services Among People Living with Disabilities in Kitui County, Kenya Social-Economic Factors Affecting Accessibility to Sanitation and Hygiene Services Among People Living with Disabilities in Kitui County, Kenya Exclusive Breastfeeding and Its Determinants Among Adolescent Mothers in Kibera Informal Settlement, Nairobi County, Kenya
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1