Reliability based Joint Distribution Network and Distributed Generation Expansion Planning

Milad Kabirifar, M. Fotuhi‐Firuzabad, M. Moeini‐Aghtaie, Niloofar Pourghaderi, M. Lehtonen
{"title":"Reliability based Joint Distribution Network and Distributed Generation Expansion Planning","authors":"Milad Kabirifar, M. Fotuhi‐Firuzabad, M. Moeini‐Aghtaie, Niloofar Pourghaderi, M. Lehtonen","doi":"10.1109/PMAPS47429.2020.9183536","DOIUrl":null,"url":null,"abstract":"In this paper the reliability of distribution network is modeled in joint multistage expansion planning of distribution network assets and distributed generations (DGs). The imposed costs due to network reliability weakness are considerable in the distribution level. Therefore in the proposed model distribution network operator (DNO) considers the costs associated with load interruptions in the planning problem. In this regard, reliability evaluation of the network is modeled in the joint multistage distribution network expansion planning (MDNEP) problem in an integrated manner while the network topology is unknown until the planning problem is not solved. In the proposed joint MDNEP problem the investment plan of network assets including feeders, substations and transformers as well as DGs are jointly obtained. Involving the reliability costs in the joint MDNEP problem is based on linearized mathematical model for calculating reliability index of expected energy not served (EENS). Therefore the proposed model is formulated in the form of mixed integer linear programming (MILP) which can be efficiently solved using off-the-shelf software.","PeriodicalId":126918,"journal":{"name":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS47429.2020.9183536","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In this paper the reliability of distribution network is modeled in joint multistage expansion planning of distribution network assets and distributed generations (DGs). The imposed costs due to network reliability weakness are considerable in the distribution level. Therefore in the proposed model distribution network operator (DNO) considers the costs associated with load interruptions in the planning problem. In this regard, reliability evaluation of the network is modeled in the joint multistage distribution network expansion planning (MDNEP) problem in an integrated manner while the network topology is unknown until the planning problem is not solved. In the proposed joint MDNEP problem the investment plan of network assets including feeders, substations and transformers as well as DGs are jointly obtained. Involving the reliability costs in the joint MDNEP problem is based on linearized mathematical model for calculating reliability index of expected energy not served (EENS). Therefore the proposed model is formulated in the form of mixed integer linear programming (MILP) which can be efficiently solved using off-the-shelf software.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于可靠性的联合配电网与分布式发电扩展规划
本文在配电网资产和分布式代(dg)的联合多阶段扩展规划中建立了配电网可靠性模型。在配电层面,由于网络可靠性不足所带来的成本是相当可观的。因此,在该模型中,配电网运营商在规划问题中考虑了与负荷中断相关的成本。为此,将联合多阶段配电网扩展规划(MDNEP)问题集成建模,在规划问题未解决之前,网络拓扑是未知的。在提出的联合MDNEP问题中,共同得出了包括馈线、变电站、变压器和dg在内的网络资产的投资计划。基于线性化数学模型计算期望不服务能量(EENS)可靠性指标,将可靠性成本纳入联合MDNEP问题。因此,所提出的模型以混合整数线性规划(MILP)的形式表示,可以使用现成的软件有效地求解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operating Reserve Assessment in Systems with Energy Storage and Electric Vehicles Framework and methodology for active distribution grid planning in Norway Parallel GPU Implementation for Fast Generating System Adequacy Assessment via Sequential Monte Carlo Simulation Distribution System Planning Considering Power Quality, Loadability and Economic Aspects Modelling and Simulation of Uncertainty in the Placement of Distributed Energy Resources for Planning Applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1