{"title":"Multiple Load Controllers for Industry Using Arm Cortex","authors":"K. Kamble, Dipa N.Kokane, M. Ghute","doi":"10.1109/ICSCCC.2018.8703318","DOIUrl":null,"url":null,"abstract":"In the present power system for load management the end of user help to minimize peak demands on the utility infrastructure as well as better utilization of power plant capacity. In this project we used ARM CORTEX. The load demand at every instant first calculated and then compared with the permissible maximum load value, and when the instantaneous maximum demand value is inferior than the permission limit then the operation to be considered in equilibrium state, but when the of instantaneous value of maximum demand crosses the limits of controller, ARM CORTEX comes into the picture and control the load by the phenomena of load shedding based on the priority set by the user. Multiple Demand Controller is a device design to control and meet the need of power management in industry in a conscious manner although device are on standby mode consume power so in this case if corrective action is not taken the controller switches off non-essential loads in a logical sequence.","PeriodicalId":148491,"journal":{"name":"2018 First International Conference on Secure Cyber Computing and Communication (ICSCCC)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 First International Conference on Secure Cyber Computing and Communication (ICSCCC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSCCC.2018.8703318","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In the present power system for load management the end of user help to minimize peak demands on the utility infrastructure as well as better utilization of power plant capacity. In this project we used ARM CORTEX. The load demand at every instant first calculated and then compared with the permissible maximum load value, and when the instantaneous maximum demand value is inferior than the permission limit then the operation to be considered in equilibrium state, but when the of instantaneous value of maximum demand crosses the limits of controller, ARM CORTEX comes into the picture and control the load by the phenomena of load shedding based on the priority set by the user. Multiple Demand Controller is a device design to control and meet the need of power management in industry in a conscious manner although device are on standby mode consume power so in this case if corrective action is not taken the controller switches off non-essential loads in a logical sequence.