Penentuan Interval Waktu Penggantian dan Perbaikan Komponen Kritis Mesin Bubut Type SS-850 di PT. Hamdan Jaya Makmur Dengan Metode Age Replacement

T. Rachman, Darmiolla Natasia Watunglawar, M. D. Amperajaya, Septian Rahmat Adnan, I. Sriwana
{"title":"Penentuan Interval Waktu Penggantian dan Perbaikan Komponen Kritis Mesin Bubut Type SS-850 di PT. Hamdan Jaya Makmur Dengan Metode Age Replacement","authors":"T. Rachman, Darmiolla Natasia Watunglawar, M. D. Amperajaya, Septian Rahmat Adnan, I. Sriwana","doi":"10.25170/metris.v23i01.3547","DOIUrl":null,"url":null,"abstract":"PT. Hamdan Jaya Makmur is a company that runs in the field of Machining, Engineering, Fabrication, Stamping, and Trading Company, which produces products for small, medium and modern industries. Less than optimal maintenance system with corrective maintenance causes PT. Hamdan Jaya Makmur often experiences machine failure. Based on historical data, it can be seen that the lathe machine type SS-850 experienced very high downtime. Therefore, it is necessary to plan optimal and preventive maintenance of the machine in order to produce according to the target and increase the reliability of the machine. The purpose of this research is to determine the time interval and cost of preventive replacement on components of the lathe machine type SS-850 at PT. Hamdan Jaya Makmur. The method used in this research is the Age Replacement method, namely by determining critical components, determining the distribution pattern of damage, determining distribution parameters, and calculating MTTF and MTTR, where the results obtained are preventive replacement time intervals, and calculating preventive replacement costs. The results obtained from this research are that there are four critical components on the lathe machine type SS-850, namely electric components with a preventive replacement time interval of 11 days and a preventive replacement cost of Rp.3,080,679,253, bearing components have a preventive replacement time interval of 14 days and a preventive replacement cost of Rp.4,931,989,307, the gearbox component has a preventive replacement time interval of 33 days and a preventive replacement cost of Rp.11,621,532,829, and bolt and nut components have a preventive replacement time interval of 11 days and a preventive replacement cost of Rp.1,615,296,412.","PeriodicalId":402087,"journal":{"name":"Jurnal METRIS","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal METRIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25170/metris.v23i01.3547","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

PT. Hamdan Jaya Makmur is a company that runs in the field of Machining, Engineering, Fabrication, Stamping, and Trading Company, which produces products for small, medium and modern industries. Less than optimal maintenance system with corrective maintenance causes PT. Hamdan Jaya Makmur often experiences machine failure. Based on historical data, it can be seen that the lathe machine type SS-850 experienced very high downtime. Therefore, it is necessary to plan optimal and preventive maintenance of the machine in order to produce according to the target and increase the reliability of the machine. The purpose of this research is to determine the time interval and cost of preventive replacement on components of the lathe machine type SS-850 at PT. Hamdan Jaya Makmur. The method used in this research is the Age Replacement method, namely by determining critical components, determining the distribution pattern of damage, determining distribution parameters, and calculating MTTF and MTTR, where the results obtained are preventive replacement time intervals, and calculating preventive replacement costs. The results obtained from this research are that there are four critical components on the lathe machine type SS-850, namely electric components with a preventive replacement time interval of 11 days and a preventive replacement cost of Rp.3,080,679,253, bearing components have a preventive replacement time interval of 14 days and a preventive replacement cost of Rp.4,931,989,307, the gearbox component has a preventive replacement time interval of 33 days and a preventive replacement cost of Rp.11,621,532,829, and bolt and nut components have a preventive replacement time interval of 11 days and a preventive replacement cost of Rp.1,615,296,412.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
确定PT. Hamdan Jaya型号bub -850发动机更换和修理的关键间隔
PT. Hamdan Jaya Makmur是一家从事机械加工,工程,制造,冲压和贸易的公司,为中小型和现代工业生产产品。不完善的维修系统和正确的维修导致PT. Hamdan Jaya Makmur经常遇到机器故障。根据历史数据可以看出,SS-850型车床的停机时间非常高。因此,为了按目标生产,增加机器的可靠性,有必要对机器进行优化和预防性维护计划。本研究的目的是确定Hamdan Jaya Makmur工厂SS-850型车床部件预防性更换的时间间隔和成本。本研究采用的方法是年龄置换法,即通过确定关键部件,确定损伤分布规律,确定分布参数,计算MTTF和MTTR,其中得到的结果为预防性更换时间间隔,并计算预防性更换成本。研究结果表明:SS-850型车床上有4个关键部件,即电气部件,其预防性更换时间间隔为11天,预防性更换成本为3,080,679,253卢比;轴承部件,其预防性更换时间间隔为14天,预防性更换成本为4,931,989,307卢比;齿轮箱部件的预防性更换时间间隔为33天,预防性更换费用为Rp.11,621,532,829,螺栓和螺母部件的预防性更换时间间隔为11天,预防性更换费用为Rp.1,615,296,412。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Penerapan Rantai Markov Pada Pola Perpindahan Pembelian di Produk Songkok The Application of Sentiment Analysis on Customers Responses in Social Media (Case Study: Indihome and First Media Internet Service Provider) PENJADWALAN PERAWAT BERDASARKAN MINIMASI PELANGGARAN PERATURAN DAN MINIMASI BIAYA LEMBUR Natural Tourism Potential Assessment Model in Rembang Regency Analisis Peramalan Dengan Simulasi Monte Carlo dan Implementasi Pengendalian Persediaan Gula Berdasarkan EOQ
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1