To Grid or Not to Grid : Viability of Standalone Distribution Networks in the Far North

Teemu Nurmi, P. Karhu, Ella Leppänen, Sami Herranen, P. Holopainen, S. Kalabin, Kasperi Koimäki, Jere Luoma-Aho, Iida Salmivesi, J. Tammi, Martin Vidjeskog, J. Millar
{"title":"To Grid or Not to Grid : Viability of Standalone Distribution Networks in the Far North","authors":"Teemu Nurmi, P. Karhu, Ella Leppänen, Sami Herranen, P. Holopainen, S. Kalabin, Kasperi Koimäki, Jere Luoma-Aho, Iida Salmivesi, J. Tammi, Martin Vidjeskog, J. Millar","doi":"10.1109/RTUCON.2018.8659874","DOIUrl":null,"url":null,"abstract":"This paper summarizes the work of two studies (2016 and 2017) into whether electricity grid connection is economically beneficial when solar, or solar and wind generation is locally installed to an island community in the south of Finland. Three types of customer groups were considered: summer cottages, free-standing energy houses and a camping site. Approximated consumption time series based on measured data and simulated time series data for wind and solar production based on rigorous statistical modelling were used to make a sober assessment of the viability of the scenarios. It transpired that, based on 2016 costs for the solar-only option, and 2017 costs for the solar and wind option, that it is more economical to make a 7 km MV feeder connection to a primary substation than invest in the backup generation and storage necessary to provide supply to even the summer-only demand scenarios. The methodology is outlined with reference to full reports available online.","PeriodicalId":192943,"journal":{"name":"2018 IEEE 59th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE 59th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTUCON.2018.8659874","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper summarizes the work of two studies (2016 and 2017) into whether electricity grid connection is economically beneficial when solar, or solar and wind generation is locally installed to an island community in the south of Finland. Three types of customer groups were considered: summer cottages, free-standing energy houses and a camping site. Approximated consumption time series based on measured data and simulated time series data for wind and solar production based on rigorous statistical modelling were used to make a sober assessment of the viability of the scenarios. It transpired that, based on 2016 costs for the solar-only option, and 2017 costs for the solar and wind option, that it is more economical to make a 7 km MV feeder connection to a primary substation than invest in the backup generation and storage necessary to provide supply to even the summer-only demand scenarios. The methodology is outlined with reference to full reports available online.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电网还是不电网:远北地区独立配电网络的可行性
本文总结了两项研究(2016年和2017年)的工作,研究了当太阳能或太阳能和风力发电在芬兰南部的一个岛屿社区当地安装时,电网连接是否具有经济效益。考虑了三种类型的客户群体:夏季小屋,独立式能源屋和露营地。使用基于实测数据的近似消耗时间序列和基于严格统计建模的风能和太阳能生产模拟时间序列数据,对情景的可行性进行了清醒的评估。根据2016年纯太阳能方案的成本,以及2017年太阳能和风能方案的成本,建立一个7公里中压馈线连接到主变电站比投资备用发电和存储更经济,即使是夏季需求方案也需要提供供应。方法概述参照在线提供的完整报告。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Indirect Model Predictive Current Control (CCS-MPC) for Grid-Connected Single-Phase Three-Level NPC Quasi-Z-Source PV Inverter Heat consumption modelling and optimisation for power substations Research of Shark Concept Using 3D Finite Element Analysis Expedience and Possibilities of Implementation of HV Single-transformer Substations Intelligent grid-interactive single-phase inverter
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1