Feasibility of Budget for Acquisition of Two Joint Support Ships

E. Barkel, T. Yalkin
{"title":"Feasibility of Budget for Acquisition of Two Joint Support Ships","authors":"E. Barkel, T. Yalkin","doi":"10.1080/1941658X.2013.843423","DOIUrl":null,"url":null,"abstract":"The mandate of the Parliamentary Budget Officer is to provide independent analysis to Parliament on the state of the nation's finances, the government's estimates, and trends in the Canadian economy, and, upon request from a committee or parliamentarian, to estimate the financial cost of any proposal for matters over which Parliament has jurisdiction. The PBO received requests from the Member from St John's East and the Member from Scarborough-Guildwood to undertake an independent cost assessment of the Joint Support Ship project. This report assesses the feasibility of replacing Canada's current Auxiliary Oiler Replenishment ships with two Joint Support Ships within the allocated funding envelope. The cost estimates and observations presented in this report represent a preliminary set of data for discussion and may change subject to the provision of detailed financial and non-financial data to the Parliamentary Budget Officer by the Department of National Defence, Public Works, and Government Services Canada, and the shipyards. The cost estimates included reflect a point-in-time set of observations based on limited and high-level data obtained from a variety of sources. These high-level cost estimates and observations are neither to be viewed as conclusions in relation to the policy merits of the legislation nor as a view to future costs.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"140 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2013.843423","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The mandate of the Parliamentary Budget Officer is to provide independent analysis to Parliament on the state of the nation's finances, the government's estimates, and trends in the Canadian economy, and, upon request from a committee or parliamentarian, to estimate the financial cost of any proposal for matters over which Parliament has jurisdiction. The PBO received requests from the Member from St John's East and the Member from Scarborough-Guildwood to undertake an independent cost assessment of the Joint Support Ship project. This report assesses the feasibility of replacing Canada's current Auxiliary Oiler Replenishment ships with two Joint Support Ships within the allocated funding envelope. The cost estimates and observations presented in this report represent a preliminary set of data for discussion and may change subject to the provision of detailed financial and non-financial data to the Parliamentary Budget Officer by the Department of National Defence, Public Works, and Government Services Canada, and the shipyards. The cost estimates included reflect a point-in-time set of observations based on limited and high-level data obtained from a variety of sources. These high-level cost estimates and observations are neither to be viewed as conclusions in relation to the policy merits of the legislation nor as a view to future costs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
采购两艘联合支援舰预算的可行性
议会预算官的职责是向议会提供关于国家财政状况、政府预算和加拿大经济趋势的独立分析,并应委员会或议员的要求,对议会管辖范围内的任何提案的财政成本进行估算。PBO收到了来自St John's East的成员和来自Scarborough-Guildwood的成员的请求,要求对联合支援船项目进行独立的成本评估。本报告评估了在分配的资金范围内用两艘联合支援船取代加拿大目前的辅助加油船的可行性。本报告中提出的成本估计和观察结果是供讨论的一组初步数据,可能会因加拿大国防、公共工程和政府服务部以及造船厂向议会预算官员提供详细的财务和非财务数据而发生变化。所列费用概算反映了根据从各种来源获得的有限和高水平数据所作的一组时间点观察结果。这些高水平的费用估计和意见既不应被视为关于立法的政策价值的结论,也不应被视为对未来费用的看法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board EOV Multiproduct Cost-Volume-Profit Model: A Resource Reallocation Approach for Decision Making Dynamics of New Building Construction Costs: Implications for Forecasting Escalation Allowances Balancing Expert Opinion and Historical Data: The Case of Baseball Umpires Using Robust Statistical Methodology to Evaluate the Cost Performance of Project Delivery Systems: A Case Study of Horizontal Construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1