Constrained Markov Decision Processes with Total Expected Cost Criteria

E. Altman, Said Boularouk, D. Josselin
{"title":"Constrained Markov Decision Processes with Total Expected Cost Criteria","authors":"E. Altman, Said Boularouk, D. Josselin","doi":"10.1145/3306309.3306342","DOIUrl":null,"url":null,"abstract":"We study in this paper a multiobjective dynamic programmming where all the criteria are in the form of total expected sum of costs till absorption in some set of states M. We assume that instantaneous costs are strictly positive and make no assumption on the ergodic structure of the Markov Decision Process. Our main result is to extend the linear program solution approach that was previously derived for transient CMDPs (Constrained Markov Decision Processes) to general ergodic structure. Several (additive) cost metrics are defined and (possibly randomized) routing policies are sought which minimize one of the costs subject to constraints over the other objectives.","PeriodicalId":113198,"journal":{"name":"Proceedings of the 12th EAI International Conference on Performance Evaluation Methodologies and Tools","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 12th EAI International Conference on Performance Evaluation Methodologies and Tools","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3306309.3306342","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

We study in this paper a multiobjective dynamic programmming where all the criteria are in the form of total expected sum of costs till absorption in some set of states M. We assume that instantaneous costs are strictly positive and make no assumption on the ergodic structure of the Markov Decision Process. Our main result is to extend the linear program solution approach that was previously derived for transient CMDPs (Constrained Markov Decision Processes) to general ergodic structure. Several (additive) cost metrics are defined and (possibly randomized) routing policies are sought which minimize one of the costs subject to constraints over the other objectives.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
具有总期望成本准则的约束马尔可夫决策过程
本文研究了一个多目标动态规划问题,其中所有的准则都是在某一组状态m下的成本的总期望和。我们假设瞬时成本是严格正的,并且对马尔可夫决策过程的遍历结构不作任何假设。我们的主要成果是将以前为瞬态CMDPs(约束马尔可夫决策过程)导出的线性规划解方法扩展到一般遍历结构。定义了几个(附加的)成本指标,并寻求(可能是随机的)路由策略,使受其他目标约束的其中一个成本最小化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Revenue-Driven Scheduling in Drone Delivery Networks with Time-sensitive Service Level Agreements A proof of the conjecture in "Pricing surplus server capacity for mean waiting time sensitive customers" Tandem stochastic systems: Jackson networks, asymmetric exclusion processes, asymmetric inclusion processes and Catalan numbers Ultimately Stationary Policies to Approximate Risk-Sensitive Discounted MDPs A bottleneck with randomly distorted arrival times
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1