{"title":"Software Industry Goals for the Years 2014 through 2018","authors":"Capers Jones","doi":"10.1080/1941658X.2014.890493","DOIUrl":null,"url":null,"abstract":"This article discusses 20 quantitative targets for software engineering projects that are technically feasible to be achieved within a five year window. Some leading companies have already achieved many of these targets, but average and lagging companies have achieved only a few, if any. Software needs firm achievable goals expressed in quantitative fashion. For example the first goal is to remove 99.5% of bugs or defects before delivery rather than today’s average of below 90%. Inspections and static analysis prior to testing can achieve this goal for essentially every project.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2014.890493","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
This article discusses 20 quantitative targets for software engineering projects that are technically feasible to be achieved within a five year window. Some leading companies have already achieved many of these targets, but average and lagging companies have achieved only a few, if any. Software needs firm achievable goals expressed in quantitative fashion. For example the first goal is to remove 99.5% of bugs or defects before delivery rather than today’s average of below 90%. Inspections and static analysis prior to testing can achieve this goal for essentially every project.