{"title":"Evaluation of risk levels in static mechanical equipment: a fuzzy expert system approach","authors":"A. Seneviratne, R. Ratnayake","doi":"10.1504/IJIDS.2016.076514","DOIUrl":null,"url":null,"abstract":"It is necessary to evaluate the risk levels in piping components of offshore production and process facilities (OP%PFs) to investigate potential failures. In an OP%PF, piping plays a vital role within the static mechanical equipment. Inspection planners make recommendations on the thickness measurement locations (TMLs) to be monitored based on: historical data, risk-based inspection (RBI) analysis results, plant inspection strategy guidance, etc. The inspection plans made by inexperienced inspection planners are of poor quality compared to an inspection plan made by an experienced inspection planner. Hence, to mitigate the problem, it is vital to develop expert systems to support inexperienced inspection planners and minimise suboptimal decisions. This manuscript illustrates the use of a fuzzy inference system (FIS) as an expert system for making optimal in-service inspection recommendations based on the current status and trends of TMLs. The proposed FIS enables the expertise of experienced inspection planners to be incorporated via membership functions (MFs) and a rule base, which will maintain the quality of an inspection programme at the intended level.","PeriodicalId":303039,"journal":{"name":"Int. J. Inf. Decis. Sci.","volume":"25 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Decis. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJIDS.2016.076514","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

It is necessary to evaluate the risk levels in piping components of offshore production and process facilities (OP%PFs) to investigate potential failures. In an OP%PF, piping plays a vital role within the static mechanical equipment. Inspection planners make recommendations on the thickness measurement locations (TMLs) to be monitored based on: historical data, risk-based inspection (RBI) analysis results, plant inspection strategy guidance, etc. The inspection plans made by inexperienced inspection planners are of poor quality compared to an inspection plan made by an experienced inspection planner. Hence, to mitigate the problem, it is vital to develop expert systems to support inexperienced inspection planners and minimise suboptimal decisions. This manuscript illustrates the use of a fuzzy inference system (FIS) as an expert system for making optimal in-service inspection recommendations based on the current status and trends of TMLs. The proposed FIS enables the expertise of experienced inspection planners to be incorporated via membership functions (MFs) and a rule base, which will maintain the quality of an inspection programme at the intended level.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
静态机械设备风险等级评价:模糊专家系统方法
评估海上生产和工艺设施管道组件的风险水平(OP%PFs)以调查潜在故障是必要的。在OP%PF中,管道在静态机械设备中起着至关重要的作用。检查计划人员根据:历史数据、基于风险的检查(RBI)分析结果、工厂检查策略指导等,对要监测的厚度测量位置(tml)提出建议。与有经验的检验计划人员制定的检验计划相比,没有经验的检验计划人员制定的检验计划质量较差。因此,为了缓解这个问题,开发专家系统来支持没有经验的检查计划人员,并最大限度地减少次优决策是至关重要的。本文阐述了利用模糊推理系统(FIS)作为专家系统,根据tml的现状和趋势提出最优的在役检查建议。拟议的FIS使经验丰富的检验计划者的专业知识能够通过成员功能(mf)和规则库结合起来,这将使检验计划的质量保持在预期的水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of the relationship between sustainability and software performance Health information exchange adoption: influences of public insurance programs Evaluation of risk causing factors for the incidence of neck and shoulder pain in adolescents using fuzzy analytic hierarchy process Technical debt reduction using epsilon-Nash equilibrium for the perturbed software refactor game model Performance evaluation of arc welding processes for the manufacturing of pressure vessel using novel hybrid MCDM technique
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1