Totok Sundoro, S. Utomo, A. Mulyono., Imam Muthohar
{"title":"PENENTUAN PRIORITAS PROGRAM PENANGANAN JALAN KABUPATEN MENGGUNAKAN METODE MULTIKRITERIA DI KABUPATEN KULON PROGO","authors":"Totok Sundoro, S. Utomo, A. Mulyono., Imam Muthohar","doi":"10.26593/JH.V7I1.4552.43-52","DOIUrl":null,"url":null,"abstract":"Abstract The regency road management program budgeting process is carried out through a series of stages, starting from proposal to budget determination. Common perceptions regarding the basis for determining priorities for regency road management programs are essential so that the budgeting process is fast, directed, and transparent. This study begins with a questionnaire survey of government, community, and academic or researcher repre-sentatives regarding the importance and application levels of the criteria and sub-criteria in determining priorities in Kulon Progo Regency. Survey data, which were analyzed using Importance-Performance Analysis, resulted in criteria and sub-criteria that were modeled using Structural Equation Modeling. The resulting sub-criteria weights are then validated using the Delphi Method. This study produces a readiness criteria weight of 40% and a multicriteria weight of 60%. The weights of the multicriteria compilers are technical 34%, economic spatial 35%, and social geopolitical environment 31%. Keywords: road handling; program priority; regency roads; readiness criteria; multicriteria Abstrak Proses penganggaran program penanganan jalan kabupaten dilakukan melalui serangkaian tahapan, mulai dari usulan sampai dengan penetapan anggaran. Penyamaan persepsi, mengenai dasar penentuan prioritas program penanganan jalan kabupaten, sangat diperlukan agar proses penetapan anggaran menjadi cepat, terarah, dan transparan. Penelitian ini dimulai dengan survei kuesioner terhadap perwakilan pemerintah, masyarakat, dan akademisi atau peneliti mengenai tingkat kepentingan dan tingkat penerapan kriteria dan subkriteria dalam penentuan prioritas di Kabupaten Kulon Progo. Data hasil survei, yang dianalisis menggunakan Importance-Performance Analysis, menghasilkan kriteria dan subkriteria yang dimodelkan dengan menggunakan Struc-tural Equation Modeling. Bobot subkriteria yang dihasilkan selanjutnya divalidasi dengan menggunakan Metode Delphi. Penelitian ini menghasilkan bobot readiness criteria 40% dan bobot multicriteria 60%. Bobot kriteria penyusun multicriteria adalah teknis 34%, spasial ekonomi 35%, dan sosial lingkungan geopolitik 31%. Kata-kata kunci: penanganan jalan; prioritas program; jalan kabupaten; readiness criteria; multicriteria.","PeriodicalId":122843,"journal":{"name":"Jurnal HPJI","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal HPJI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26593/JH.V7I1.4552.43-52","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract The regency road management program budgeting process is carried out through a series of stages, starting from proposal to budget determination. Common perceptions regarding the basis for determining priorities for regency road management programs are essential so that the budgeting process is fast, directed, and transparent. This study begins with a questionnaire survey of government, community, and academic or researcher repre-sentatives regarding the importance and application levels of the criteria and sub-criteria in determining priorities in Kulon Progo Regency. Survey data, which were analyzed using Importance-Performance Analysis, resulted in criteria and sub-criteria that were modeled using Structural Equation Modeling. The resulting sub-criteria weights are then validated using the Delphi Method. This study produces a readiness criteria weight of 40% and a multicriteria weight of 60%. The weights of the multicriteria compilers are technical 34%, economic spatial 35%, and social geopolitical environment 31%. Keywords: road handling; program priority; regency roads; readiness criteria; multicriteria Abstrak Proses penganggaran program penanganan jalan kabupaten dilakukan melalui serangkaian tahapan, mulai dari usulan sampai dengan penetapan anggaran. Penyamaan persepsi, mengenai dasar penentuan prioritas program penanganan jalan kabupaten, sangat diperlukan agar proses penetapan anggaran menjadi cepat, terarah, dan transparan. Penelitian ini dimulai dengan survei kuesioner terhadap perwakilan pemerintah, masyarakat, dan akademisi atau peneliti mengenai tingkat kepentingan dan tingkat penerapan kriteria dan subkriteria dalam penentuan prioritas di Kabupaten Kulon Progo. Data hasil survei, yang dianalisis menggunakan Importance-Performance Analysis, menghasilkan kriteria dan subkriteria yang dimodelkan dengan menggunakan Struc-tural Equation Modeling. Bobot subkriteria yang dihasilkan selanjutnya divalidasi dengan menggunakan Metode Delphi. Penelitian ini menghasilkan bobot readiness criteria 40% dan bobot multicriteria 60%. Bobot kriteria penyusun multicriteria adalah teknis 34%, spasial ekonomi 35%, dan sosial lingkungan geopolitik 31%. Kata-kata kunci: penanganan jalan; prioritas program; jalan kabupaten; readiness criteria; multicriteria.
摄政公路管理项目的预算编制过程从提出方案到预算确定,经历了一系列的阶段。关于确定紧急道路管理项目优先次序的基础的共识是必不可少的,这样预算编制过程才能快速、直接和透明。本研究首先对政府、社区、学术界或研究人员代表进行问卷调查,了解标准和子标准在确定库隆Progo县优先事项中的重要性和应用水平。使用重要性-性能分析对调查数据进行分析,得出使用结构方程建模的标准和子标准。然后使用德尔菲法验证产生的子标准权重。本研究得出的准备度标准权重为40%,多标准权重为60%。多标准编译器的权重为技术34%,经济空间35%,社会地缘政治环境31%。关键词:路面装卸;项目优先级;摄政的道路;准备标准;摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:多标准摘要:Penyamaan persepsi, mengenai dasar pentuan优先项目penanganan jalan kabupaten, sangat diperlukan agar procses penetapan anggaran menjadi cepat, terarah, dan transparan。Penelitian ini dimulai dengan surveykusioner terhadap perwakilan peremintah, masyarakat, and akademii atau peneliti mengenai, tingkat keinging, dentingkat penerapan标准和子标准dalam penentan pririitas di Kabupaten Kulon Progo。数据统计,杨分析,孟古纳坎重要性-性能分析,孟古纳坎标准与子标准,杨分析,孟古纳坎结构方程建模。Bobot子标准yang dihasilkan selanjutnya divalidasi dengan menggunakan Metode Delphi。Penelitian ini menghasilkan机器人就绪标准40%,机器人多标准60%。Bobot标准penyusun多标准adalah技术占34%,空间经济占35%,而社会lingkungan地缘政治占31%。Kata-kata kunci; penanganan jalan;prioritas程序;道路县;准备标准;多准则。