Geotechnical value quantification through real options

J. Venter, E. Hamman
{"title":"Geotechnical value quantification through real options","authors":"J. Venter, E. Hamman","doi":"10.36487/ACG_REP/1905_21_VENTER","DOIUrl":null,"url":null,"abstract":"Slope stability acceptance criteria is often applied from standard tables representing industry practice or corporate risk tolerance. While in many cases such standard off-the-shelf solutions are fit for purpose, in the case of slopes with a high value increase per incremental slope angle increase, or where highcost infrastructure or other sensitive locations are nearby, it pays to have a custom Probability of Failure acceptance criteria determined through risk analysis. The value lies in being able to quantify the consequences of hazards that are slope angle driven, and in determining the mining schedule consequences of these hazards through Probability of Failure. \nThis paper demonstrates the concept of the risk-based geotechnical assessment through a practical example of a small saprolite pit in West Africa, how such an analysis was carried out, and how the costappropriate risk controls were put in place. The example is based on a gold mine, and considers the timing and size of potential failure as well as the mining schedule and cash flow schedule. The type and size of appropriate risk controls are also estimated in the calculation. Finally, the paper demonstrates through the model how the value of geotechnical engineering controls can be calculated using the concept of real options.","PeriodicalId":337751,"journal":{"name":"Proceedings of the First International Conference on Mining Geomechanical Risk","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the First International Conference on Mining Geomechanical Risk","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36487/ACG_REP/1905_21_VENTER","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Slope stability acceptance criteria is often applied from standard tables representing industry practice or corporate risk tolerance. While in many cases such standard off-the-shelf solutions are fit for purpose, in the case of slopes with a high value increase per incremental slope angle increase, or where highcost infrastructure or other sensitive locations are nearby, it pays to have a custom Probability of Failure acceptance criteria determined through risk analysis. The value lies in being able to quantify the consequences of hazards that are slope angle driven, and in determining the mining schedule consequences of these hazards through Probability of Failure. This paper demonstrates the concept of the risk-based geotechnical assessment through a practical example of a small saprolite pit in West Africa, how such an analysis was carried out, and how the costappropriate risk controls were put in place. The example is based on a gold mine, and considers the timing and size of potential failure as well as the mining schedule and cash flow schedule. The type and size of appropriate risk controls are also estimated in the calculation. Finally, the paper demonstrates through the model how the value of geotechnical engineering controls can be calculated using the concept of real options.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过实物期权量化岩土工程价值
边坡稳定性验收标准通常来自代表行业惯例或企业风险承受能力的标准表格。虽然在许多情况下,这种标准的现成解决方案适合于目的,但在坡角增量增加值较高的斜坡的情况下,或者在高成本基础设施或其他敏感位置附近,通过风险分析确定自定义的失败接受概率标准是值得的。其价值在于能够量化坡角驱动的危险后果,并通过失效概率确定这些危险的采矿进度后果。本文通过西非一个小型腐岩坑的实际例子,展示了基于风险的岩土工程评估的概念,以及如何进行这种分析,以及如何实施成本合适的风险控制。该示例以金矿为例,考虑了潜在故障的时间和大小,以及采矿计划和现金流计划。在计算中还估计了适当的风险控制的类型和规模。最后,通过模型论证了如何利用实物期权的概念计算岩土工程控制的价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Geotechnical risk-informed decision-making in mining Using qualitative risk assessment as a leading indicator for geotechnical risk in mining Construction of a damage risk model for footwall drifts Quantifying uncertainty in mining geomechanics design Development of the Mine Geotechnical Risk Index
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1